Assessment Year | 2002 |
---|---|
Principal Product | Envelopes |
NAICS |
n/a
|
SIC | 2677: Envelopes |
Sales Range | $10 M to 50M |
# of Employees | 221 |
Plant Area |
140,000
ft2
|
Annual Production | 1
units
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $363,263 | 6,822,040 |
kWh
|
$0.053 |
Electricity Demand | $33,947 | 15,440 |
kW-mo/yr
|
$2.20 |
Electricity Fees | $3,020 | - |
|
- |
Natural Gas | $19,915 | 3,577 |
MMBtu
|
$5.57 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $235,928 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $6,487 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.2414: Use waste heat from hot flue gases to preheat | $9,982 | $2,000 | - | - |
$9,982
-
MMBtu
|
- | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $7,400 | - |
$6,940
130,445
kWh
|
$460
-
kW-mo/yr
|
- | - | - | |
03 | 2.7231: Use radiant heater for spot heating | $5,276 | $11,250 | - | - |
$5,276
-
MMBtu
|
- | - | |
04 | 2.7135: Install occupancy sensors | $3,761 | $3,375 |
$3,376
63,462
kWh
|
$385
-
kW-mo/yr
|
- | - | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $3,268 | $2,000 |
$3,065
57,613
kWh
|
$203
-
kW-mo/yr
|
- | - | - | |
06 | 2.4133: Use most efficient type of electric motors | $2,628 | $2,850 |
$2,504
47,057
kWh
|
$124
-
kW-mo/yr
|
- | - | - | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $364 | $1,200 |
$341
6,408
kWh
|
$23
-
kW-mo/yr
|
- | - | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $227 | $223 |
$124
2,330
kWh
|
$7
-
kW-mo/yr
|
- | - | $96 | |
09 | 3.7196: Use re-usable filters | $16,560 | $500 | - | - | - | - | $16,560 | |
10 | 3.3131: Use evaporation to concentrate material | $4,010 | $3,600 | - | - | - |
$4,010
-
gal
|
- | |
11 | 4.522: Modify storage space to avoid rental of a warehouse | $144,000 | $500,000 | - | - | - | - | $144,000 | |
12 | 3.5316: Contract a wood pallet recycling company | $36,800 | $1,000 | - | - | - | - | $36,800 | |
13 | 4.821: Pay bills on time to avoid late fees | $1,652 | - | - | - | - | - | $1,652 | |
TOTAL RECOMMENDED | $235,928 | $527,998 |
$16,350
307,315
kWh
|
$1,202
-
kW-mo/yr
|
$15,258
-
MMBtu
|
$4,010
-
gal
|
$199,108 | ||
TOTAL IMPLEMENTED | $6,487 | $6,273 |
$6,034
113,408
kWh
|
$357
-
kW-mo/yr
|
- | - | $96 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs