ITAC Assessment: MI0027
ITAC logo
ITAC Assessment: MI0027
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Corrugated Products
NAICS
n/a
SIC 2654:
Sales Range $10
M
to 50
M
# of Employees 52
Plant Area 65,000
ft2
Annual Production 180,000,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $43,021 682,878
kWh
Electricity Demand $14,713 1,932
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $165,224 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $154,448

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Primary Product Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $4,448 $1,859 - $4,448
-
kW-mo/yr
- -
02 2.7212: Install or upgrade insulation on hvac distribution systems $1,410 $2,000 $1,410
22,384
kWh
- - -
03 4.454: Modify startup/shutdown times $150,000 $3,900 - - - $150,000
04 3.5131: Recycle white water $2,639 $982 - - $2,639
-
Tgal
-
05 2.4323: Use optimum size and capacity equipment $6,727 $1,250 $4,904
77,834
kWh
$1,823
-
kW-mo/yr
- -
TOTAL RECOMMENDED $165,224 $9,991 $6,314
100,218
kWh
$6,271
-
kW-mo/yr
$2,639
-
Tgal
$150,000
TOTAL IMPLEMENTED $154,448 $5,759 - $4,448
-
kW-mo/yr
- $150,000
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs