ITAC Assessment: UD0252
ITAC logo
ITAC Assessment: UD0252
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product GARDEN TOOLS
NAICS
n/a
SIC 3423: Hand and Edge Tools, Except Machine Tools and Handsaws
Sales Range $10
M
to 50
M
# of Employees 170
Plant Area
n/a
Annual Production 3,000,000
pieces
Production Hrs. Annual 4,320
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $138,331 2,778,136
kWh
Natural Gas $142,691 25,857
MMBtu
Fuel Oil #2 $49,449 14,420
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $40,251 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $39,586

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings Administrative Changes Savings
01 2.8114: Change rate schedules or other changes in utility service $25,000 - - $25,858
-
MMBtu
- $(-858.0)
02 2.1233: Analyze flue gas for proper air/fuel ratio $638 $902 - - $638
-
MMBtu
-
03 2.4131: Size electric motors for peak operating efficiency $508 $600 $508
20,809
kWh
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $9,667 $9,550 $7,455
153,576
kWh
$(-660.0)
-
MMBtu
- $2,872
05 2.7492: Use proper thickness of insulation on building envelope $665 $728 $121
2,638
kWh
$544
-
MMBtu
- -
06 2.2414: Use waste heat from hot flue gases to preheat $3,267 $4,098 - $3,267
-
MMBtu
- -
07 2.2437: Recover waste heat from equipment $506 $1,000 - $506
-
MMBtu
- -
TOTAL RECOMMENDED $40,251 $16,878 $8,084
177,023
kWh
$29,515
-
MMBtu
$638
-
MMBtu
$2,014
TOTAL IMPLEMENTED $39,586 $16,150 $7,963
174,385
kWh
$28,971
-
MMBtu
$638
-
MMBtu
$2,014
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings Administrative Changes Savings