| Assessment Year | 1988 |
|---|---|
| Principal Product | GARDEN TOOLS |
| NAICS |
n/a
|
| SIC | 3423: Hand and Edge Tools, Except Machine Tools and Handsaws |
| Sales Range | $10 M to 50M |
| # of Employees | 170 |
| Plant Area |
n/a
|
| Annual Production | 3,000,000
pieces
|
| Production Hrs. Annual | 4,320
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $138,331 | 2,778,136 |
kWh
|
$0.050 |
| Natural Gas | $142,691 | 25,857 |
MMBtu
|
$5.52 |
| Fuel Oil #2 | $49,449 | 14,420 |
MMBtu
|
$3.43 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $40,251 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $39,586 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.8114: Change rate schedules or other changes in utility service | $25,000 | - | - |
$25,858
-
MMBtu
|
- | $(-858.0) | |
| 02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $638 | $902 | - | - |
$638
-
MMBtu
|
- | |
| 03 | 2.4131: Size electric motors for peak operating efficiency | $508 | $600 |
$508
20,809
kWh
|
- | - | - | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,667 | $9,550 |
$7,455
153,576
kWh
|
$(-660.0)
-
MMBtu
|
- | $2,872 | |
| 05 | 2.7492: Use proper thickness of insulation on building envelope | $665 | $728 |
$121
2,638
kWh
|
$544
-
MMBtu
|
- | - | |
| 06 | 2.2414: Use waste heat from hot flue gases to preheat | $3,267 | $4,098 | - |
$3,267
-
MMBtu
|
- | - | |
| 07 | 2.2437: Recover waste heat from equipment | $506 | $1,000 | - |
$506
-
MMBtu
|
- | - | |
| TOTAL RECOMMENDED | $40,251 | $16,878 |
$8,084
177,023
kWh
|
$29,515
-
MMBtu
|
$638
-
MMBtu
|
$2,014 | ||
| TOTAL IMPLEMENTED | $39,586 | $16,150 |
$7,963
174,385
kWh
|
$28,971
-
MMBtu
|
$638
-
MMBtu
|
$2,014 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs