Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,667

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SF0050 #05 Y:1994 Install / repair insulation on steam lines $1,254 $748
SF0050 #04 Y:1994 Use adjustable frequency drive or multiple speed motors on existing system $21,960 $19,510
SF0050 #03 Y:1994 Use most efficient type of electric motors $2,230 $1,125
SF0050 #02 Y:1994 Optimize plant power factor $3,578 $5,911
SF0050 #01 Y:1994 Utilize higher efficiency lamps and/or ballasts $48,642 $166,900
OD0022 #07 Y:1994 Analyze flue gas for proper air/fuel ratio $1,807 $400
OD0022 #06 Y:1994 Utilize energy-efficient belts and other improved mechanisms $4,353 $3,562
OD0022 #05 Y:1994 Use most efficient type of electric motors $4,120 $4,008
OD0022 #04 Y:1994 Use cooling tower or economizer to replace chiller cooling $7,277 $4,655
OD0022 #03 Y:1994 Moderate cooling tower outlet temperature $3,379 -
OD0022 #02 Y:1994 Meter waste water $6,284 $1,521
OD0022 #01 Y:1994 Utilize higher efficiency lamps and/or ballasts $14,327 $25,510
HO0095 #05 Y:1994 Change procedures / equipment / operating conditions $9,047 $1,500
HO0095 #04 Y:1994 Replace electrically-operated equipment with fossil fuel equipment $33,498 $121,200
HO0095 #03 Y:1994 Install compressor air intakes in coolest locations $566 $200
HO0095 #02 Y:1994 Utilize higher efficiency lamps and/or ballasts $2,588 $3,686
HO0095 #01 Y:1994 Utilize higher efficiency lamps and/or ballasts $7,143 $3,677
UF0110 #06 Y:1994 Use most efficient type of electric motors $95 $284
UF0110 #05 Y:1994 Replace electric reheat with heat pipes $19,763 $21,000
UF0110 #04 Y:1994 Replace existing hvac unit with high efficiency model $25,754 -