Assessment Year | 1995 |
---|---|
Principal Product | Engine Ignition Systems |
NAICS |
n/a
|
SIC | 3724: Aircraft Engines and Engine Parts |
Sales Range | $10 M to 50M |
# of Employees | 125 |
Plant Area |
73,350
ft2
|
Annual Production | 6,000
pieces
|
Production Hrs. Annual | 3,120
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $164,841 | 3,341,442 |
kWh
|
$0.049 |
Natural Gas | $15,482 | 2,502 |
MMBtu
|
$6.19 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $50,116 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,457 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,227 | $646 |
$3,227
38,980
kWh
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,047 | $4,477 |
$1,047
17,292
kWh
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $230 | $400 |
$230
2,345
kWh
|
- | |
04 | 2.7232: Replace existing hvac unit with high efficiency model | $25,754 | - |
$25,754
252,052
kWh
|
- | |
05 | 2.7271: Replace electric reheat with heat pipes | $19,763 | $21,000 |
$3,350
80,598
kWh
|
$16,413
-
MMBtu
|
|
06 | 2.4133: Use most efficient type of electric motors | $95 | $284 |
$95
1,758
kWh
|
- | |
TOTAL RECOMMENDED | $50,116 | $26,807 |
$33,703
393,025
kWh
|
$16,413
-
MMBtu
|
||
TOTAL IMPLEMENTED | $3,457 | $1,046 |
$3,457
41,325
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs