ITAC Assessment: UF0110
ITAC logo
ITAC Assessment: UF0110
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Engine Ignition Systems
NAICS
n/a
SIC 3724: Aircraft Engines and Engine Parts
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 73,350
ft2
Annual Production 6,000
pieces
Production Hrs. Annual 3,120
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $164,841 3,341,442
kWh
Natural Gas $15,482 2,502
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $50,116 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,457

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,227 $646 $3,227
38,980
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,047 $4,477 $1,047
17,292
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $230 $400 $230
2,345
kWh
-
04 2.7232: Replace existing hvac unit with high efficiency model $25,754 - $25,754
252,052
kWh
-
05 2.7271: Replace electric reheat with heat pipes $19,763 $21,000 $3,350
80,598
kWh
$16,413
-
MMBtu
06 2.4133: Use most efficient type of electric motors $95 $284 $95
1,758
kWh
-
TOTAL RECOMMENDED $50,116 $26,807 $33,703
393,025
kWh
$16,413
-
MMBtu
TOTAL IMPLEMENTED $3,457 $1,046 $3,457
41,325
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs