ITAC Assessment: SD0539
ITAC logo
ITAC Assessment: SD0539
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Sausages and Other Prepared Meats
NAICS 311612: Meat Processed from Carcasses
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $50
M
to 100
M
# of Employees 200
Plant Area 100,000
ft2
Annual Production 35,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $469,239 4,910,946
kWh
Electricity Demand $185,102 10,651
kW-mo/yr
Electricity Fees $39,190 -
Natural Gas $76,766 21,633
MMBtu
TOTAL YEARLY COSTS $770,297
RECOMMENDED SAVINGS* $317,037 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,127

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $289,101 $1,166,652 $297,215
3,112,200
kWh
$104,019
-
kW-mo/yr
$(-62,244.0) $(-49,889.0)
-
MMBtu
02 2.7121: Utilize daylight whenever possible in lieu of artificial light $8,037 $28,000 $3,793
39,718
kWh
$4,244
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $6,649 $9,540 $4,924
51,590
kWh
$1,725
-
kW-mo/yr
- -
04 2.4133: Use most efficient type of electric motors $5,984 $18,111 $4,408
46,163
kWh
$1,576
-
kW-mo/yr
- -
05 2.2135: Repair and eliminate steam leaks $4,167 $600 - - - $4,167
-
MMBtu
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,327 $1,500 $1,802
18,870
kWh
$525
-
kW-mo/yr
- -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $496 $1,765 $394
4,121
kWh
$102
-
kW-mo/yr
- -
08 2.4239: Eliminate or reduce compressed air usage $276 $800 $257
2,693
kWh
$19
-
kW-mo/yr
- -
TOTAL RECOMMENDED $317,037 $1,226,968 $312,793
3,275,355
kWh
$112,210
-
kW-mo/yr
$(-62,244.0) $(-45,722.0)
-
MMBtu
TOTAL IMPLEMENTED $19,127 $29,751 $11,134
116,623
kWh
$3,826
-
kW-mo/yr
- $4,167
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs