ITAC Assessment: CO0423
ITAC logo
ITAC Assessment: CO0423
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product printed circuit boards
NAICS
n/a
SIC 3672: Printed Circuit Boards
Sales Range $1
M
to 5
M
# of Employees 50
Plant Area 17,520
ft2
Annual Production 46,940
thousand feet
Production Hrs. Annual 4,420
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $20,724 1,144,490
kWh
Electricity Demand $44,061 3,133
kW-mo/yr
Electricity Fees $204 -
Natural Gas $4,863 1,113
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,440 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,590

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings Water Consumption Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $850 $1,000 - $850
-
kW-mo/yr
- - - - - - -
02 2.7447: Install vinyl strip / high speed / air curtain doors $140 $420 - - $140
-
MMBtu
- - - - - -
03 3.4151: Minimize water usage $9,100 $11,210 - - - $3,040
-
Tgal
- - $2,000 - $4,060
-
Tgal
04 3.1293: Separate treatments for each type of solution and recycle $8,870 $2,500 $(-40.0)
(-2,052)
kWh
- - - - - - $8,910 -
05 3.1242: Allow drainage before withdrawing object $4,550 $2,000 $146
7,913
kWh
- - - - - - $4,404 -
06 3.1293: Separate treatments for each type of solution and recycle $2,580 $25,000 $(-430.0)
(-23,447)
kWh
- - - $760
-
gal
$650 - $1,600 -
07 3.3122: Use filtration, centrifuging to remove contaminants $2,350 $6,900 $(-140.0)
(-7,913)
kWh
- - - $2,490
-
gal
- - - -
TOTAL RECOMMENDED $28,440 $49,030 $(-464.0)
(-25,499)
kWh
$850
-
kW-mo/yr
$140
-
MMBtu
$3,040
-
Tgal
$3,250
-
gal
$650 $2,000 $14,914 $4,060
-
Tgal
TOTAL IMPLEMENTED $27,590 $48,030 $(-464.0)
(-25,499)
kWh
- $140
-
MMBtu
$3,040
-
Tgal
$3,250
-
gal
$650 $2,000 $14,914 $4,060
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs