| Assessment Year | 1998 |
|---|---|
| Principal Product | printed circuit boards |
| NAICS |
n/a
|
| SIC | 3672: Printed Circuit Boards |
| Sales Range | $1 M to 5M |
| # of Employees | 50 |
| Plant Area |
17,520
ft2
|
| Annual Production | 46,940
thousand feet
|
| Production Hrs. Annual | 4,420
hrs
|
| Location (State) | Colorado |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $20,724 | 1,144,490 |
kWh
|
$0.018 |
| Electricity Demand | $44,061 | 3,133 |
kW-mo/yr
|
$14.06 |
| Electricity Fees | $204 | - |
|
- |
| Natural Gas | $4,863 | 1,113 |
MMBtu
|
$4.37 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $28,440 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $27,590 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Other Liquid (haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings | Water Consumption Savings |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $850 | $1,000 | - |
$850
-
kW-mo/yr
|
- | - | - | - | - | - | - | |
| 02 | 2.7447: Install vinyl strip / high speed / air curtain doors | $140 | $420 | - | - |
$140
-
MMBtu
|
- | - | - | - | - | - | |
| 03 | 3.4151: Minimize water usage | $9,100 | $11,210 | - | - | - |
$3,040
-
Tgal
|
- | - | $2,000 | - |
$4,060
-
Tgal
|
|
| 04 | 3.1293: Separate treatments for each type of solution and recycle | $8,870 | $2,500 |
$(-40.0)
(-2,052)
kWh
|
- | - | - | - | - | - | $8,910 | - | |
| 05 | 3.1242: Allow drainage before withdrawing object | $4,550 | $2,000 |
$146
7,913
kWh
|
- | - | - | - | - | - | $4,404 | - | |
| 06 | 3.1293: Separate treatments for each type of solution and recycle | $2,580 | $25,000 |
$(-430.0)
(-23,447)
kWh
|
- | - | - |
$760
-
gal
|
$650 | - | $1,600 | - | |
| 07 | 3.3122: Use filtration, centrifuging to remove contaminants | $2,350 | $6,900 |
$(-140.0)
(-7,913)
kWh
|
- | - | - |
$2,490
-
gal
|
- | - | - | - | |
| TOTAL RECOMMENDED | $28,440 | $49,030 |
$(-464.0)
(-25,499)
kWh
|
$850
-
kW-mo/yr
|
$140
-
MMBtu
|
$3,040
-
Tgal
|
$3,250
-
gal
|
$650 | $2,000 | $14,914 |
$4,060
-
Tgal
|
||
| TOTAL IMPLEMENTED | $27,590 | $48,030 |
$(-464.0)
(-25,499)
kWh
|
- |
$140
-
MMBtu
|
$3,040
-
Tgal
|
$3,250
-
gal
|
$650 | $2,000 | $14,914 |
$4,060
-
Tgal
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Other Liquid (haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings | Water Consumption Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs