| Assessment Year | 1995 |
|---|---|
| Principal Product | Offset and letterpress printing |
| NAICS |
n/a
|
| SIC | 2671: Packaging Paper and Plastics Film, Coated and Laminated |
| Sales Range | $10 M to 50M |
| # of Employees | 168 |
| Plant Area |
84,000
ft2
|
| Annual Production | 1,926,000,000
thousand feet
|
| Production Hrs. Annual | 7,488
hrs
|
| Location (State) | Virginia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $317,576 | 5,622,802 |
kWh
|
$0.056 |
| Natural Gas | $278,526 | 52,256 |
MMBtu
|
$5.33 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $41,547 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $38,168 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Consumption Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $14,327 | $25,510 |
$14,327
253,810
kWh
|
- | - | |
| 02 | 3.4155: Meter waste water | $6,284 | $1,521 | - | - |
$6,284
-
Tgal
|
|
| 03 | 2.2611: Moderate cooling tower outlet temperature | $3,379 | - |
$3,379
59,789
kWh
|
- | - | |
| 04 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $7,277 | $4,655 |
$7,277
128,957
kWh
|
- | - | |
| 05 | 2.4133: Use most efficient type of electric motors | $4,120 | $4,008 |
$4,120
72,978
kWh
|
- | - | |
| 06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $4,353 | $3,562 |
$4,353
77,081
kWh
|
- | - | |
| 07 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,807 | $400 | - |
$1,807
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $41,547 | $39,656 |
$33,456
592,615
kWh
|
$1,807
-
MMBtu
|
$6,284
-
Tgal
|
||
| TOTAL IMPLEMENTED | $38,168 | $39,656 |
$30,077
532,826
kWh
|
$1,807
-
MMBtu
|
$6,284
-
Tgal
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Water Consumption Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs