ITAC Assessment: OD0022
ITAC logo
ITAC Assessment: OD0022
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Offset and letterpress printing
NAICS
n/a
SIC 2671: Packaging Paper and Plastics Film, Coated and Laminated
Sales Range $10
M
to 50
M
# of Employees 168
Plant Area 84,000
ft2
Annual Production 1,926,000,000
thousand feet
Production Hrs. Annual 7,488
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $317,576 5,622,802
kWh
Natural Gas $278,526 52,256
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $41,547 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $38,168

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Consumption Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $14,327 $25,510 $14,327
253,810
kWh
- -
02 3.4155: Meter waste water $6,284 $1,521 - - $6,284
-
Tgal
03 2.2611: Moderate cooling tower outlet temperature $3,379 - $3,379
59,789
kWh
- -
04 2.2614: Use cooling tower or economizer to replace chiller cooling $7,277 $4,655 $7,277
128,957
kWh
- -
05 2.4133: Use most efficient type of electric motors $4,120 $4,008 $4,120
72,978
kWh
- -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,353 $3,562 $4,353
77,081
kWh
- -
07 2.1233: Analyze flue gas for proper air/fuel ratio $1,807 $400 - $1,807
-
MMBtu
-
TOTAL RECOMMENDED $41,547 $39,656 $33,456
592,615
kWh
$1,807
-
MMBtu
$6,284
-
Tgal
TOTAL IMPLEMENTED $38,168 $39,656 $30,077
532,826
kWh
$1,807
-
MMBtu
$6,284
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs