| Assessment Year | 1997 |
|---|---|
| Principal Product | Shoes and Boots |
| NAICS |
n/a
|
| SIC | 3143: Men's Footwear, Except Athletic |
| Sales Range | $10 M to 50M |
| # of Employees | 350 |
| Plant Area |
103,000
ft2
|
| Annual Production | 725,000
pieces
|
| Production Hrs. Annual | 2,040
hrs
|
| Location (State) | Arkansas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $73,543 | 2,122,509 |
kWh
|
$0.035 |
| Electricity Demand | $95,263 | 6,776 |
kW-mo/yr
|
$14.06 |
| Natural Gas | $5,972 | 1,118 |
MMBtu
|
$5.34 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $41,446 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $16,173 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $11,218 | $202 |
$3,345
95,545
kWh
|
$7,873
-
kW-mo/yr
|
- | - | - | |
| 02 | 2.4133: Use most efficient type of electric motors | $65 | $900 |
$19
586
kWh
|
$46
-
kW-mo/yr
|
- | - | - | |
| 03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $133 | - |
$39
1,172
kWh
|
$94
-
kW-mo/yr
|
- | - | - | |
| 04 | 2.4221: Install compressor air intakes in coolest locations | $604 | $160 |
$177
4,982
kWh
|
$427
-
kW-mo/yr
|
- | - | - | |
| 05 | 2.7314: Reduce ventilation air | $4,426 | $600 |
$4,426
228,898
kWh
|
- | - | - | - | |
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,530 | $200 |
$1,347
38,687
kWh
|
$3,183
-
kW-mo/yr
|
- | - | - | |
| 07 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $7,019 | - |
$(-223.0)
(-586)
kWh
|
- | - |
$7,585
-
lb
|
$(-343.0) | |
| 08 | 3.4115: Recover and reuse cooling water | $2,296 | $4,200 | - | - |
$2,296
-
Tgal
|
- | - | |
| 09 | 4.514: Re-arrange equipment layout to reduce handling costs | $11,155 | $4,500 | - | - | - |
$2,155
-
lb
|
$9,000 | |
| TOTAL RECOMMENDED | $41,446 | $10,762 |
$9,130
369,284
kWh
|
$11,623
-
kW-mo/yr
|
$2,296
-
Tgal
|
$9,740
-
lb
|
$8,657 | ||
| TOTAL IMPLEMENTED | $16,173 | $1,700 |
$5,608
268,757
kWh
|
$3,323
-
kW-mo/yr
|
- |
$7,585
-
lb
|
$(-343.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs