Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Shoes and Boots
NAICS
n/a
SIC 3143: Men's Footwear, Except Athletic
Sales Range $10
M
to 50
M
# of Employees 350
Plant Area 103,000
ft2
Annual Production 725,000
pieces
Production Hrs. Annual 2,040
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $73,543 2,122,509
kWh
Electricity Demand $95,263 6,776
kW-mo/yr
Natural Gas $5,972 1,118
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $41,446 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,173

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $11,218 $202 $3,345
95,545
kWh
$7,873
-
kW-mo/yr
- - -
02 2.4133: Use most efficient type of electric motors $65 $900 $19
586
kWh
$46
-
kW-mo/yr
- - -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $133 - $39
1,172
kWh
$94
-
kW-mo/yr
- - -
04 2.4221: Install compressor air intakes in coolest locations $604 $160 $177
4,982
kWh
$427
-
kW-mo/yr
- - -
05 2.7314: Reduce ventilation air $4,426 $600 $4,426
228,898
kWh
- - - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,530 $200 $1,347
38,687
kWh
$3,183
-
kW-mo/yr
- - -
07 3.5315: Lease / purchase baler; sell cardboard to recycler $7,019 - $(-223.0)
(-586)
kWh
- - $7,585
-
lb
$(-343.0)
08 3.4115: Recover and reuse cooling water $2,296 $4,200 - - $2,296
-
Tgal
- -
09 4.514: Re-arrange equipment layout to reduce handling costs $11,155 $4,500 - - - $2,155
-
lb
$9,000
TOTAL RECOMMENDED $41,446 $10,762 $9,130
369,284
kWh
$11,623
-
kW-mo/yr
$2,296
-
Tgal
$9,740
-
lb
$8,657
TOTAL IMPLEMENTED $16,173 $1,700 $5,608
268,757
kWh
$3,323
-
kW-mo/yr
- $7,585
-
lb
$(-343.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs