ITAC Assessment: TN0476
ITAC logo
ITAC Assessment: TN0476
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product PRINTED,FINISHED FABRIC
NAICS
n/a
SIC 2261: Finishers of Broadwoven Fabrics of Cotton
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area
n/a
Annual Production 225,000
thousand feet
Production Hrs. Annual 8,400
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $575,112 12,381,301
kWh
Natural Gas $384,704 298,402
MMBtu
Coal $640,720 448,448
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $96,080 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Coal Savings Administrative Changes Savings
01 2.2511: Insulate bare equipment $9,523 $2,425 - $9,523
-
MMBtu
-
02 2.2135: Repair and eliminate steam leaks $8,013 $2,350 - $8,013
-
MMBtu
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $56,030 $36,440 $56,030
1,218,054
kWh
- -
04 2.2136: Install / repair insulation on steam lines $4,854 $1,100 - $4,854
-
MMBtu
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $14,303 $2,307 $16,610
361,079
kWh
- $(-2,307.0)
06 2.4312: Improve lubrication practices $3,357 - $3,357
72,978
kWh
- -
TOTAL RECOMMENDED $96,080 $44,622 $75,997
1,652,111
kWh
$22,390
-
MMBtu
$(-2,307.0)
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Coal Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs