1,920
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| MA0016 #03 Y:1984 | 03 | 1984 | Install set-back timers | $453 | $101 | |
| MA0016 #02 Y:1984 | 02 | 1984 | Close holes and openings in building such as broken windows | $1,480 | $3,178 | |
| MA0016 #01 Y:1984 | 01 | 1984 | Air condition only space necessary | $7,772 | $5,000 | |
| LT0020 #03 Y:1984 | 03 | 1984 | Flash condensate to produce lower pressure steam | $4,460 | $1,150 | |
| LT0020 #02 Y:1984 | 02 | 1984 | Use hot process fluids to preheat incoming process fluids | $4,380 | $12,500 | |
| LT0020 #01 Y:1984 | 01 | 1984 | Use heat in flue gases to preheat products or materials | $29,200 | $18,740 | |
| LT0019 #02 Y:1984 | 02 | 1984 | Utilize higher efficiency lamps and/or ballasts | $482 | $444 | |
| LT0019 #01 Y:1984 | 01 | 1984 | Direct warmest air to combustion intake | $277 | $8 | |
| LT0018 #05 Y:1984 | 05 | 1984 | Reduce illumination to minimum necessary levels | $273 | $60 | |
| LT0018 #04 Y:1984 | 04 | 1984 | Replace broken windows and/or window sash | $458 | $81 | |
| LT0018 #03 Y:1984 | 03 | 1984 | Use proper thickness of insulation on building envelope | $456 | $237 | |
| LT0018 #02 Y:1984 | 02 | 1984 | Use proper thickness of insulation on building envelope | $46 | $75 | |
| LT0018 #01 Y:1984 | 01 | 1984 | Install timers and/or thermostats | $2,397 | $59 | |
| LT0017 #06 Y:1984 | 06 | 1984 | Use demand controller or load shedder | $6,190 | $10,000 | |
| LT0017 #05 Y:1984 | 05 | 1984 | Re-size charging openings or add a movable door on equipment | $569 | $600 | |
| LT0017 #04 Y:1984 | 04 | 1984 | Analyze flue gas for proper air/fuel ratio | $1,960 | $13,000 | |
| LT0017 #03 Y:1984 | 03 | 1984 | Analyze flue gas for proper air/fuel ratio | $4,540 | $150 | |
| LT0016 #05 Y:1984 | 05 | 1984 | Re-use or recycle hot or cold process exhaust air | $71,500 | $194,500 | |
| LT0016 #04 Y:1984 | 04 | 1984 | Re-use or recycle hot or cold process exhaust air | $66,600 | $42,900 | |
| LT0016 #03 Y:1984 | 03 | 1984 | Replace fossil fuel equipment with electrical equipment | $3,593 | $6,000 |