ITAC Assessment: LT0016
ITAC logo
ITAC Assessment: LT0016
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product CLAY POTS
NAICS
n/a
SIC 3269: Pottery Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 78
Plant Area
n/a
Annual Production 18,600,000
lb
Production Hrs. Annual 8,520
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $94,461 1,657,972
kWh
Natural Gas $560,989 123,744
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $144,127 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,434

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,887 $2,485 $1,887
33,705
kWh
-
02 2.7121: Utilize daylight whenever possible in lieu of artificial light $547 $309 $547
15,533
kWh
-
03 2.1321: Replace fossil fuel equipment with electrical equipment $3,593 $6,000 $(-107.0)
(-1,758)
kWh
$3,700
-
MMBtu
04 2.2443: Re-use or recycle hot or cold process exhaust air $66,600 $42,900 $(-13,700.0)
(-316,530)
kWh
$80,300
-
MMBtu
05 2.2443: Re-use or recycle hot or cold process exhaust air $71,500 $194,500 $(-11,200.0)
(-260,551)
kWh
$82,700
-
MMBtu
TOTAL RECOMMENDED $144,127 $246,194 $(-22,573.0)
(-529,601)
kWh
$166,700
-
MMBtu
TOTAL IMPLEMENTED $2,434 $2,794 $2,434
49,238
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs