ITAC Assessment: SU0368
ITAC logo
ITAC Assessment: SU0368
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Disposable Foodservice Packaging
NAICS 326150: Urethane and Other Foam Product (except Polystyrene) Manufacturing
SIC 3086: Plastics Foam Products
Sales Range $100
M
to 500
M
# of Employees 152
Plant Area 221,294
ft2
Annual Production 1,091,000,000
pieces
Production Hrs. Annual 8,400
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,214,803 13,820,600
kWh
Electricity Demand $229,819 25,906
kW-mo/yr
Electricity Fees $20,298 -
Natural Gas $444,870 45,574
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $132,114 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $12,372 - $12,372
140,580
kWh
- - - -
02 2.8121: Apply for tax-free status for energy purchases $11,558 - - - - - $11,558
03 2.7224: Reduce space conditioning during non-working hours $8,530 - - - $8,530
-
MMBtu
- -
04 2.4322: Use or replace with energy efficient substitutes $2,224 - $1,426
16,200
kWh
$798
-
kW-mo/yr
- - -
05 2.7122: Disconnect ballasts $818 - $677
7,694
kWh
$141
-
kW-mo/yr
- - -
06 2.4221: Install compressor air intakes in coolest locations $13,361 $5,132 $13,361
151,826
kWh
- - - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,567 $1,182 $2,567
29,175
kWh
- - - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $2,026 $2,021 $586
6,658
kWh
$81
-
kW-mo/yr
- $1,359 -
09 2.7491: Insulate glazing, walls, ceilings, and roofs $73,210 $87,750 - - $73,210
-
MMBtu
- -
10 3.1161: Eliminate/reduce an operation $4,653 $5,760 $(-156.0)
(-1,776)
kWh
$(-1,277.0)
-
kW-mo/yr
- - $6,086
11 2.7135: Install occupancy sensors $490 $715 $490
5,565
kWh
- - - -
12 2.6211: Conserve energy by efficient use of vending machines $305 $507 $305
3,468
kWh
- - - -
TOTAL RECOMMENDED $132,114 $103,067 $31,628
359,390
kWh
$(-257.0)
-
kW-mo/yr
$81,740
-
MMBtu
$1,359 $17,644
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs