169,801
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| WV0068 #07 Y:1995 | 07 | 1995 | Install / repair insulation on steam lines | $791 | $1,071 | |
| WV0068 #06 Y:1995 | 06 | 1995 | Direct warmest air to combustion intake | $773 | $2,700 | |
| WV0068 #05 Y:1995 | 05 | 1995 | Reduce the pressure of compressed air to the minimum required | $733 | $15 | |
| WV0068 #04 Y:1995 | 04 | 1995 | Install compressor air intakes in coolest locations | $271 | $295 | |
| WV0068 #03 Y:1995 | 03 | 1995 | Utilize energy-efficient belts and other improved mechanisms | $1,044 | $1,240 | |
| WV0068 #02 Y:1995 | 02 | 1995 | Use most efficient type of electric motors | $3,299 | $5,490 | |
| WV0068 #01 Y:1995 | 01 | 1995 | Utilize higher efficiency lamps and/or ballasts | $3,697 | $662 | |
| UD0460 #05 Y:1995 | 05 | 1995 | Utilize higher efficiency lamps and/or ballasts | $2,312 | $4,077 | |
| UD0460 #04 Y:1995 | 04 | 1995 | Utilize higher efficiency lamps and/or ballasts | $1,670 | $5,216 | |
| UD0460 #03 Y:1995 | 03 | 1995 | Recover waste heat from equipment | $1,416 | $3,000 | |
| UD0460 #02 Y:1995 | 02 | 1995 | Reschedule plant operations or reduce load to avoid peaks | $11,025 | - | |
| UD0460 #01 Y:1995 | 01 | 1995 | Optimize plant power factor | $41,888 | $30,000 | |
| TN0551 #05 Y:1995 | 05 | 1995 | Install compressor air intakes in coolest locations | $164 | $520 | |
| TN0551 #04 Y:1995 | 04 | 1995 | Make a practice of turning off lights when not needed | $623 | - | |
| TN0551 #03 Y:1995 | 03 | 1995 | Utilize energy-efficient belts and other improved mechanisms | $3,133 | $1,410 | |
| TN0551 #02 Y:1995 | 02 | 1995 | Insulate bare equipment | $3,753 | $790 | |
| TN0551 #01 Y:1995 | 01 | 1995 | Install / repair insulation on steam lines | $5,639 | $2,700 | |
| SF0063 #11 Y:1995 | 11 | 1995 | Lease / purchase baler; sell cardboard to recycler | $7,643 | $8,000 | |
| SF0063 #10 Y:1995 | 10 | 1995 | Use filter and drying oven to reduce sludge volume | $11,374 | $9,769 | |
| SF0063 #09 Y:1995 | 09 | 1995 | Use filter and drying oven to reduce sludge volume | $5,603 | $9,769 |