ITAC Assessment: AM0249
ITAC logo
ITAC Assessment: AM0249
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Soft drinks
NAICS
n/a
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $50
M
to 100
M
# of Employees 275
Plant Area 4,500
ft2
Annual Production 58,500,000
Tgal
Production Hrs. Annual 5,040
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $334,132 5,383,060
kWh
Natural Gas $72,752 21,641
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,318 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,190

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Disposal Savings Other Liquid (haz) Savings
01 2.3132: Recharge batteries on during off-peak demand periods $5,760 - $5,760
-
kWh
- - -
02 2.4231: Reduce the pressure of compressed air to the minimum required $2,310 $45 $2,310
36,635
kWh
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,790 $75 $1,790
57,444
kWh
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,130 $390 $1,130
16,706
kWh
- - -
05 2.7124: Make a practice of turning off lights when not needed $540 - $540
17,292
kWh
- - -
06 2.7261: Install timers and/or thermostats $490 $560 $170
5,569
kWh
$320
-
MMBtu
- -
07 2.7145: Install skylights $115 $60 $115
3,517
kWh
- - -
08 3.4151: Minimize water usage $1,300 $900 - - $1,300
-
Tgal
-
09 3.8132: Use less toxic and volatile solvent substitutes $883 $1,028 - - - $883
-
gal
TOTAL RECOMMENDED $14,318 $3,058 $11,815
137,163
kWh
$320
-
MMBtu
$1,300
-
Tgal
$883
-
gal
TOTAL IMPLEMENTED $12,190 $1,580 $10,570
116,940
kWh
$320
-
MMBtu
$1,300
-
Tgal
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Disposal Savings Other Liquid (haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs