Assessment Year | 1995 |
---|---|
Principal Product | Patching Compounds |
NAICS |
n/a
|
SIC | 2891: Adhesives and Sealants |
Sales Range | $10 M to 50M |
# of Employees | 45 |
Plant Area |
53,000
ft2
|
Annual Production | 39,000,000
lb
|
Production Hrs. Annual | 4,000
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $66,280 | 942,849 |
kWh
|
$0.070 |
Natural Gas | $17,168 | 3,319 |
MMBtu
|
$5.17 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $49,519 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Water Disposal Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,712 | $4,635 |
$3,712
60,082
kWh
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,157 | $40 |
$3,157
50,996
kWh
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,126 | $40 |
$1,126
18,171
kWh
|
- | - | |
04 | 2.4133: Use most efficient type of electric motors | $1,021 | $395 |
$1,021
16,413
kWh
|
- | - | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $391 | $926 |
$391
6,448
kWh
|
- | - | |
06 | 2.4221: Install compressor air intakes in coolest locations | $211 | $40 |
$211
3,517
kWh
|
- | - | |
07 | 2.4314: Use synthetic lubricant | $66 | $92 |
$66
1,172
kWh
|
- | - | |
08 | 2.7447: Install vinyl strip / high speed / air curtain doors | $874 | $200 | - |
$874
-
Tgal
|
- | |
09 | 3.5316: Contract a wood pallet recycling company | $38,961 | - | - | - |
$38,961
-
lb
|
|
TOTAL RECOMMENDED | $49,519 | $6,368 |
$9,684
156,799
kWh
|
$874
-
Tgal
|
$38,961
-
lb
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Water Disposal Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs