Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

169,066

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
ND0213 #06 Y:1995 Install compressor air intakes in coolest locations $615 $1,500
ND0213 #05 Y:1995 Disconnect ballasts $1,465 $4,733
ND0213 #04 Y:1995 Eliminate leaks in inert gas and compressed air lines/ valves $1,811 $850
ND0213 #03 Y:1995 Close holes and openings in building such as broken windows $1,576 $1,240
ND0213 #02 Y:1995 Analyze flue gas for proper air/fuel ratio $9,837 $5,000
ND0213 #01 Y:1995 Use most efficient type of electric motors $23,611 $48,290
KG0029 #07 Y:1995 Install compressor air intakes in coolest locations $160 $300
KG0029 #06 Y:1995 Eliminate leaks in inert gas and compressed air lines/ valves $780 $600
KG0029 #05 Y:1995 Install timers and/or thermostats $1,640 $300
KG0029 #04 Y:1995 Use most efficient type of electric motors $6,500 $13,480
KG0029 #03 Y:1995 Utilize higher efficiency lamps and/or ballasts $966 $353
KG0029 #02 Y:1995 Analyze flue gas for proper air/fuel ratio $13,307 $3,000
KG0029 #01 Y:1995 Repair faulty insulation in furnaces, boilers, etc $27,964 $682
GT0557 #07 Y:1995 Change procedures / equipment / operating conditions $14,300 -
GT0557 #06 Y:1995 Replace fossil fuel equipment with electrical equipment $4,100 $240
GT0557 #05 Y:1995 Use waste heat from hot flue gases to preheat $13,120 $13,340
GT0557 #04 Y:1995 Utilize energy-efficient belts and other improved mechanisms $2,600 $2,270
GT0557 #03 Y:1995 Use most efficient type of electric motors $2,320 $58,400
GT0557 #02 Y:1995 Install spectral reflectors / delamp $910 -
GT0557 #01 Y:1995 Utilize higher efficiency lamps and/or ballasts $2,590 $23,400