Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

168,994

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MA0340 #10 Y:1995 Utilize energy-efficient belts and other improved mechanisms $356 $570
MA0340 #09 Y:1995 Install compressor air intakes in coolest locations $558 $127
MA0340 #08 Y:1995 Turn off equipment during breaks, reduce operating time $612 $330
MA0340 #07 Y:1995 Eliminate leaks in inert gas and compressed air lines/ valves $753 -
MA0340 #06 Y:1995 Reduce ventilation air $1,190 $3,320
MA0340 #05 Y:1995 Utilize higher efficiency lamps and/or ballasts $1,369 $2,464
MA0340 #04 Y:1995 Pay utility bills on time $1,820 -
MA0340 #03 Y:1995 Improve air circulation with destratification fans / other methods $2,634 $5,995
MA0340 #02 Y:1995 Eliminate or reduce compressed air usage $3,349 $200
MA0340 #01 Y:1995 Use power during off-peak periods $4,800 -
BD0033 #07 Y:1995 Eliminate leaks in inert gas and compressed air lines/ valves $1,476 $350
BD0033 #06 Y:1995 Use most efficient type of electric motors $4,667 $12,480
BD0033 #05 Y:1995 Use proper thickness of insulation on building envelope $990 $1,550
BD0033 #04 Y:1995 Utilize higher efficiency lamps and/or ballasts $463 $391
BD0033 #03 Y:1995 Reduce illumination to minimum necessary levels $3,800 $180
BD0033 #02 Y:1995 Utilize higher efficiency lamps and/or ballasts $274 $400
BD0033 #01 Y:1995 Install compressor air intakes in coolest locations $1,652 $500
UF0122 #07 Y:1995 Eliminate leaks in inert gas and compressed air lines/ valves $593 $500
UF0122 #06 Y:1995 Use most efficient type of electric motors $1,796 $5,186
UF0122 #05 Y:1995 Analyze flue gas for proper air/fuel ratio $870 $1,000