ITAC Assessment: KG0029
ITAC logo
ITAC Assessment: KG0029
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Automobile shredders and parts
NAICS
n/a
SIC 3559: Special Industry Machinery, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 230
Plant Area 85,700
ft2
Annual Production 67,500
ton
Production Hrs. Annual 6,864
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $484,729 8,982,708
kWh
Natural Gas $122,774 47,885
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $51,317 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $50,377

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1131: Repair faulty insulation in furnaces, boilers, etc $27,964 $682 - $27,964
-
MMBtu
02 2.1233: Analyze flue gas for proper air/fuel ratio $13,307 $3,000 - $13,307
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $966 $353 $966
22,567
kWh
-
04 2.4133: Use most efficient type of electric motors $6,500 $13,480 $6,500
172,626
kWh
-
05 2.7261: Install timers and/or thermostats $1,640 $300 $1,640
51,290
kWh
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $780 $600 $780
13,775
kWh
-
07 2.4221: Install compressor air intakes in coolest locations $160 $300 $160
2,931
kWh
-
TOTAL RECOMMENDED $51,317 $18,715 $10,046
263,189
kWh
$41,271
-
MMBtu
TOTAL IMPLEMENTED $50,377 $17,815 $9,106
246,483
kWh
$41,271
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs