Assessment Year | 1995 |
---|---|
Principal Product | Sewing Patterns, Catalogs |
NAICS |
n/a
|
SIC | 2741: Miscellaneous Publishing |
Sales Range | $50 M to 100M |
# of Employees | 325 |
Plant Area |
760,000
ft2
|
Annual Production | 5,300
ton
|
Production Hrs. Annual | 5,760
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $732,680 | 18,023,154 |
kWh
|
$0.041 |
Natural Gas | $318,691 | 92,791 |
MMBtu
|
$3.43 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $133,861 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $119,466 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings |
---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $23,611 | $48,290 |
$23,611
456,624
kWh
|
- | - | |
02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $9,837 | $5,000 | - |
$9,837
-
MMBtu
|
- | |
03 | 2.7444: Close holes and openings in building such as broken windows | $1,576 | $1,240 | - |
$1,576
-
MMBtu
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,811 | $850 |
$1,811
44,549
kWh
|
- | - | |
05 | 2.7122: Disconnect ballasts | $1,465 | $4,733 |
$1,465
36,049
kWh
|
- | - | |
06 | 2.4221: Install compressor air intakes in coolest locations | $615 | $1,500 |
$615
15,240
kWh
|
- | - | |
07 | 2.6218: Turn off equipment when not in use | $470 | - |
$470
11,723
kWh
|
- | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $197 | $600 |
$197
4,982
kWh
|
- | - | |
09 | 3.5314: Use in-process recycling whenever possible | $94,279 | $125,000 |
$279
6,741
kWh
|
- |
$94,000
-
Tgal
|
|
TOTAL RECOMMENDED | $133,861 | $187,213 |
$28,448
575,908
kWh
|
$11,413
-
MMBtu
|
$94,000
-
Tgal
|
||
TOTAL IMPLEMENTED | $119,466 | $174,530 |
$23,890
463,365
kWh
|
$1,576
-
MMBtu
|
$94,000
-
Tgal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs