ITAC Assessment: ND0213
ITAC logo
ITAC Assessment: ND0213
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Sewing Patterns, Catalogs
NAICS
n/a
SIC 2741: Miscellaneous Publishing
Sales Range $50
M
to 100
M
# of Employees 325
Plant Area 760,000
ft2
Annual Production 5,300
ton
Production Hrs. Annual 5,760
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $732,680 18,023,154
kWh
Natural Gas $318,691 92,791
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $133,861 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $119,466

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Disposal Savings
01 2.4133: Use most efficient type of electric motors $23,611 $48,290 $23,611
456,624
kWh
- -
02 2.1233: Analyze flue gas for proper air/fuel ratio $9,837 $5,000 - $9,837
-
MMBtu
-
03 2.7444: Close holes and openings in building such as broken windows $1,576 $1,240 - $1,576
-
MMBtu
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,811 $850 $1,811
44,549
kWh
- -
05 2.7122: Disconnect ballasts $1,465 $4,733 $1,465
36,049
kWh
- -
06 2.4221: Install compressor air intakes in coolest locations $615 $1,500 $615
15,240
kWh
- -
07 2.6218: Turn off equipment when not in use $470 - $470
11,723
kWh
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $197 $600 $197
4,982
kWh
- -
09 3.5314: Use in-process recycling whenever possible $94,279 $125,000 $279
6,741
kWh
- $94,000
-
Tgal
TOTAL RECOMMENDED $133,861 $187,213 $28,448
575,908
kWh
$11,413
-
MMBtu
$94,000
-
Tgal
TOTAL IMPLEMENTED $119,466 $174,530 $23,890
463,365
kWh
$1,576
-
MMBtu
$94,000
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs