Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

167,876

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MA0337 #02 Y:1995 Replace city water with recycled water via cooling tower $4,708 $5,000
MA0337 #01 Y:1995 Utilize higher efficiency lamps and/or ballasts $16,934 $44,000
WI0239 #11 Y:1995 Use distillation, evaporation to remove contaminants $19,100 $20,000
WI0239 #10 Y:1995 Utilize energy-efficient belts and other improved mechanisms $265 -
WI0239 #09 Y:1995 Install compressor air intakes in coolest locations $310 $960
WI0239 #08 Y:1995 Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air $1,184 $1,000
WI0239 #07 Y:1995 Schedule routine maintenance during non-operating periods $1,208 -
WI0239 #06 Y:1995 Recharge batteries on during off-peak demand periods $1,934 -
WI0239 #05 Y:1995 Lower temperature during the winter season and vice-versa $2,299 $800
WI0239 #04 Y:1995 Install occupancy sensors $1,095 $675
WI0239 #03 Y:1995 Utilize higher efficiency lamps and/or ballasts $2,418 $4,175
WI0239 #02 Y:1995 Improve air circulation with destratification fans / other methods $3,043 $4,960
WI0239 #01 Y:1995 Replace electrically-operated equipment with fossil fuel equipment $4,137 $18,000
SF0057 #08 Y:1995 Replace electrically-operated equipment with fossil fuel equipment $142,905 $479,000
SF0057 #07 Y:1995 Minimize operation of equipment maintained in standby condition $17,555 $37,000
SF0057 #06 Y:1995 Optimize plant power factor $3,137 $4,459
SF0057 #05 Y:1995 Utilize energy-efficient belts and other improved mechanisms $3,669 $1,510
SF0057 #04 Y:1995 Eliminate leaks in inert gas and compressed air lines/ valves $3,611 $250
SF0057 #03 Y:1995 Use adjustable frequency drive or multiple speed motors on existing system $40,803 $27,430
SF0057 #02 Y:1995 Install occupancy sensors $6,431 $11,418