ITAC Assessment: WI0239
ITAC logo
ITAC Assessment: WI0239
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Printed Labels
NAICS
n/a
SIC 2752: Commercial Printing, Lithographic
Sales Range $5
M
to 10
M
# of Employees 110
Plant Area 95,000
ft2
Annual Production 385,000
thousand feet
Production Hrs. Annual 7,200
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $90,879 1,820,340
kWh
Natural Gas $21,426 5,081
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $36,993 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Liquid (non-haz) Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $4,137 $18,000 $4,137
82,943
kWh
- -
02 2.7243: Improve air circulation with destratification fans / other methods $3,043 $4,960 - $3,043
-
MMBtu
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,418 $4,175 $2,418
48,359
kWh
- -
04 2.7135: Install occupancy sensors $1,095 $675 $1,095
21,981
kWh
- -
05 2.7221: Lower temperature during the winter season and vice-versa $2,299 $800 - $2,299
-
MMBtu
-
06 2.3132: Recharge batteries on during off-peak demand periods $1,934 - $1,934
-
kWh
- -
07 2.3135: Schedule routine maintenance during non-operating periods $1,208 - $1,208
-
kWh
- -
08 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air $1,184 $1,000 - $1,184
-
MMBtu
-
09 2.4221: Install compressor air intakes in coolest locations $310 $960 $310
6,155
kWh
- -
10 2.4111: Utilize energy-efficient belts and other improved mechanisms $265 - $265
5,275
kWh
- -
11 3.3125: Use distillation, evaporation to remove contaminants $19,100 $20,000 - - $19,100
-
gal
TOTAL RECOMMENDED $36,993 $50,570 $11,367
164,713
kWh
$6,526
-
MMBtu
$19,100
-
gal
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Other Liquid (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs