ITAC Assessment: SF0057
ITAC logo
ITAC Assessment: SF0057
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Wood Stock
NAICS
n/a
SIC 2421: Sawmills and Planing Mills, General
Sales Range $10
M
to 50
M
# of Employees 148
Plant Area 100,000
ft2
Annual Production 28,000
thousand feet
Production Hrs. Annual 4,862
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $305,260 2,865,768
kWh
Natural Gas $713 89
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $219,940 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,109

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $1,829 $2,843 $1,829
17,292
kWh
-
02 2.7135: Install occupancy sensors $6,431 $11,418 $6,431
60,375
kWh
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $40,803 $27,430 $40,803
383,060
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,611 $250 $3,611
33,998
kWh
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,669 $1,510 $3,669
34,584
kWh
-
06 2.3212: Optimize plant power factor $3,137 $4,459 $3,137
-
kWh
-
07 2.6242: Minimize operation of equipment maintained in standby condition $17,555 $37,000 $17,555
164,713
kWh
-
08 2.1311: Replace electrically-operated equipment with fossil fuel equipment $142,905 $479,000 $305,186
2,865,768
kWh
$(-162,281.0)
-
MMBtu
TOTAL RECOMMENDED $219,940 $563,910 $382,221
3,559,790
kWh
$(-162,281.0)
-
MMBtu
TOTAL IMPLEMENTED $9,109 $4,603 $9,109
85,874
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs