Assessment Year | 1995 |
---|---|
Principal Product | Wood Stock |
NAICS |
n/a
|
SIC | 2421: Sawmills and Planing Mills, General |
Sales Range | $10 M to 50M |
# of Employees | 148 |
Plant Area |
100,000
ft2
|
Annual Production | 28,000
thousand feet
|
Production Hrs. Annual | 4,862
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $305,260 | 2,865,768 |
kWh
|
$0.11 |
Natural Gas | $713 | 89 |
MMBtu
|
$8.01 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $219,940 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $9,109 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $1,829 | $2,843 |
$1,829
17,292
kWh
|
- | |
02 | 2.7135: Install occupancy sensors | $6,431 | $11,418 |
$6,431
60,375
kWh
|
- | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $40,803 | $27,430 |
$40,803
383,060
kWh
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,611 | $250 |
$3,611
33,998
kWh
|
- | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $3,669 | $1,510 |
$3,669
34,584
kWh
|
- | |
06 | 2.3212: Optimize plant power factor | $3,137 | $4,459 |
$3,137
-
kWh
|
- | |
07 | 2.6242: Minimize operation of equipment maintained in standby condition | $17,555 | $37,000 |
$17,555
164,713
kWh
|
- | |
08 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $142,905 | $479,000 |
$305,186
2,865,768
kWh
|
$(-162,281.0)
-
MMBtu
|
|
TOTAL RECOMMENDED | $219,940 | $563,910 |
$382,221
3,559,790
kWh
|
$(-162,281.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | $9,109 | $4,603 |
$9,109
85,874
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs