Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

167,740

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IA0113 #03 Y:1995 Substitute compressed air cooling with water or air cooling $111 $193
IA0113 #02 Y:1995 Utilize energy-efficient belts and other improved mechanisms $1,014 $684
IA0113 #01 Y:1995 Eliminate leaks in inert gas and compressed air lines/ valves $2,141 $1,000
OD0031 #08 Y:1995 Avoid frost formation on evaporators $29,378 $33,000
OD0031 #07 Y:1995 Eliminate leaks in inert gas and compressed air lines/ valves $2,309 $1,000
OD0031 #06 Y:1995 Recover waste heat from equipment $12,618 $26,618
OD0031 #05 Y:1995 Install occupancy sensors $5,440 $1,793
OD0031 #04 Y:1995 Utilize higher efficiency lamps and/or ballasts $18,336 $48,924
OD0031 #03 Y:1995 Use adjustable frequency drive or multiple speed motors on existing system $26,349 $66,206
OD0031 #02 Y:1995 Utilize energy-efficient belts and other improved mechanisms $5,159 $2,803
OD0031 #01 Y:1995 Use most efficient type of electric motors $38,274 $45,837
MA0338 #06 Y:1995 Install compressor air intakes in coolest locations $396 $289
MA0338 #05 Y:1995 Reduce space conditioning during non-working hours $617 $711
MA0338 #04 Y:1995 Eliminate leaks in inert gas and compressed air lines/ valves $2,592 $1,000
MA0338 #03 Y:1995 Eliminate or reduce compressed air usage $2,970 -
MA0338 #02 Y:1995 Use radiant heater for spot heating $3,469 $9,200
MA0338 #01 Y:1995 Turn off equipment during breaks, reduce operating time $4,008 -
BD0027 #07 Y:1995 Convert to electrostatic powder coating $35,328 $3,000
BD0027 #06 Y:1995 Use most efficient type of electric motors $1,398 $4,780
BD0027 #05 Y:1995 Install occupancy sensors $826 $250