ITAC Assessment: BD0027
ITAC logo
ITAC Assessment: BD0027
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product lighting, cabinets, and enclosures
NAICS
n/a
SIC 3645: Residential Electric Lighting Fixtures
Sales Range $1
M
to 5
M
# of Employees 40
Plant Area 54,067
ft2
Annual Production 453,000
lb
Production Hrs. Annual 2,210
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $26,063 318,581
kWh
Natural Gas $41,850 10,109
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $43,224 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,804

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,804 $450 $1,804
21,102
kWh
- -
02 2.4221: Install compressor air intakes in coolest locations $416 $150 $416
20,809
kWh
- -
03 2.2437: Recover waste heat from equipment $1,486 $1,250 - $1,486
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,966 $5,865 $1,966
24,033
kWh
- -
05 2.7135: Install occupancy sensors $826 $250 $826
9,965
kWh
- -
06 2.4133: Use most efficient type of electric motors $1,398 $4,780 $1,398
16,999
kWh
- -
07 3.2121: Convert to electrostatic powder coating $35,328 $3,000 - - $35,328
TOTAL RECOMMENDED $43,224 $15,745 $6,410
92,908
kWh
$1,486
-
MMBtu
$35,328
TOTAL IMPLEMENTED $1,804 $450 $1,804
21,102
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs