| Assessment Year | 1995 |
|---|---|
| Principal Product | lighting, cabinets, and enclosures |
| NAICS |
n/a
|
| SIC | 3645: Residential Electric Lighting Fixtures |
| Sales Range | $1 M to 5M |
| # of Employees | 40 |
| Plant Area |
54,067
ft2
|
| Annual Production | 453,000
lb
|
| Production Hrs. Annual | 2,210
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $26,063 | 318,581 |
kWh
|
$0.082 |
| Natural Gas | $41,850 | 10,109 |
MMBtu
|
$4.14 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $43,224 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $1,804 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,804 | $450 |
$1,804
21,102
kWh
|
- | - | |
| 02 | 2.4221: Install compressor air intakes in coolest locations | $416 | $150 |
$416
20,809
kWh
|
- | - | |
| 03 | 2.2437: Recover waste heat from equipment | $1,486 | $1,250 | - |
$1,486
-
MMBtu
|
- | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,966 | $5,865 |
$1,966
24,033
kWh
|
- | - | |
| 05 | 2.7135: Install occupancy sensors | $826 | $250 |
$826
9,965
kWh
|
- | - | |
| 06 | 2.4133: Use most efficient type of electric motors | $1,398 | $4,780 |
$1,398
16,999
kWh
|
- | - | |
| 07 | 3.2121: Convert to electrostatic powder coating | $35,328 | $3,000 | - | - | $35,328 | |
| TOTAL RECOMMENDED | $43,224 | $15,745 |
$6,410
92,908
kWh
|
$1,486
-
MMBtu
|
$35,328 | ||
| TOTAL IMPLEMENTED | $1,804 | $450 |
$1,804
21,102
kWh
|
- | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs