ITAC Assessment: MO0056
ITAC logo
ITAC Assessment: MO0056
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product CHARCOAL BRIQUETTES
NAICS
n/a
SIC 2861: Gum and Wood Chemicals
Sales Range $5
M
to 10
M
# of Employees 35
Plant Area
n/a
Annual Production 24,000
ton
Production Hrs. Annual 7,200
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $70,250 1,188,746
kWh
LPG $178,366 46,729
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,213 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,861

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $273 $3,117 $273
4,689
kWh
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,317 - $1,317
22,274
kWh
- -
03 2.1233: Analyze flue gas for proper air/fuel ratio $751 $1,200 - $751
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $352 - $381
6,448
kWh
- $(-29.0)
05 2.7142: Utilize higher efficiency lamps and/or ballasts $104 $270 $104
1,758
kWh
- -
06 2.4221: Install compressor air intakes in coolest locations $416 $381 $416
7,034
kWh
- -
TOTAL RECOMMENDED $3,213 $4,968 $2,491
42,203
kWh
$751
-
MMBtu
$(-29.0)
TOTAL IMPLEMENTED $2,861 $4,968 $2,110
35,755
kWh
$751
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings LPG Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs