ITAC Assessment: ORS002
ITAC logo
ITAC Assessment: ORS002
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Processed fish products
NAICS
n/a
SIC 2092: Prepared Fresh or Frozen Fish and Seafoods
Sales Range $10
M
to 50
M
# of Employees 306
Plant Area 50,000
ft2
Annual Production 10,517,176
lb
Production Hrs. Annual 2,175
hrs
Location (State) Alaska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $186,395 2,928,781
kWh
Electricity Demand $127,512 110,640
kW-mo/yr
Electricity Fees $44,106 -
LPG $8,707 698
MMBtu
Fuel Oil #6 $116,926 30,531
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $360,421 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $202,461

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #6 Savings Personnel Changes Savings Water Consumption Savings
01 2.4133: Use most efficient type of electric motors $13,472 $27,939 $8,925
151,524
kWh
$4,547
-
kW-mo/yr
- - -
02 2.4322: Use or replace with energy efficient substitutes $4,055 $15,400 $2,020
34,291
kWh
$2,035
-
kW-mo/yr
- - -
03 2.2136: Install / repair insulation on steam lines $880 $700 - - $880
-
MMBtu
- -
04 2.1224: Replace boiler $12,100 - - - $12,100
-
MMBtu
- -
05 4.441: Install automatic packing equipment $166,000 $121,000 - - - $166,000 -
06 4.441: Install automatic packing equipment $90,560 $64,000 $(-180.0)
(-2,931)
kWh
$(-160.0)
-
kW-mo/yr
- $90,900 -
07 4.441: Install automatic packing equipment $67,400 $200,000 - - - $67,400 -
08 3.4157: Replace water cooling on processes with air cooling $5,954 - - - - - $5,954
-
Tgal
TOTAL RECOMMENDED $360,421 $429,039 $10,765
182,884
kWh
$6,422
-
kW-mo/yr
$12,980
-
MMBtu
$324,300 $5,954
-
Tgal
TOTAL IMPLEMENTED $202,461 $165,039 $10,945
185,815
kWh
$6,582
-
kW-mo/yr
$12,980
-
MMBtu
$166,000 $5,954
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #6 Savings Personnel Changes Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs