Assessment Year | 1999 |
---|---|
Principal Product | Processed fish products |
NAICS |
n/a
|
SIC | 2092: Prepared Fresh or Frozen Fish and Seafoods |
Sales Range | $10 M to 50M |
# of Employees | 306 |
Plant Area |
50,000
ft2
|
Annual Production | 10,517,176
lb
|
Production Hrs. Annual | 2,175
hrs
|
Location (State) | Alaska |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $186,395 | 2,928,781 |
kWh
|
$0.064 |
Electricity Demand | $127,512 | 110,640 |
kW-mo/yr
|
$1.15 |
Electricity Fees | $44,106 | - |
|
- |
LPG | $8,707 | 698 |
MMBtu
|
$12.47 |
Fuel Oil #6 | $116,926 | 30,531 |
MMBtu
|
$3.83 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $360,421 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $202,461 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #6 Savings | Personnel Changes Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $13,472 | $27,939 |
$8,925
151,524
kWh
|
$4,547
-
kW-mo/yr
|
- | - | - | |
02 | 2.4322: Use or replace with energy efficient substitutes | $4,055 | $15,400 |
$2,020
34,291
kWh
|
$2,035
-
kW-mo/yr
|
- | - | - | |
03 | 2.2136: Install / repair insulation on steam lines | $880 | $700 | - | - |
$880
-
MMBtu
|
- | - | |
04 | 2.1224: Replace boiler | $12,100 | - | - | - |
$12,100
-
MMBtu
|
- | - | |
05 | 4.441: Install automatic packing equipment | $166,000 | $121,000 | - | - | - | $166,000 | - | |
06 | 4.441: Install automatic packing equipment | $90,560 | $64,000 |
$(-180.0)
(-2,931)
kWh
|
$(-160.0)
-
kW-mo/yr
|
- | $90,900 | - | |
07 | 4.441: Install automatic packing equipment | $67,400 | $200,000 | - | - | - | $67,400 | - | |
08 | 3.4157: Replace water cooling on processes with air cooling | $5,954 | - | - | - | - | - |
$5,954
-
Tgal
|
|
TOTAL RECOMMENDED | $360,421 | $429,039 |
$10,765
182,884
kWh
|
$6,422
-
kW-mo/yr
|
$12,980
-
MMBtu
|
$324,300 |
$5,954
-
Tgal
|
||
TOTAL IMPLEMENTED | $202,461 | $165,039 |
$10,945
185,815
kWh
|
$6,582
-
kW-mo/yr
|
$12,980
-
MMBtu
|
$166,000 |
$5,954
-
Tgal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #6 Savings | Personnel Changes Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs