168,618
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| NV0035 #04 Y:1995 | 04 | 1995 | Utilize higher efficiency lamps and/or ballasts | $761 | $511 | |
| NV0035 #03 Y:1995 | 03 | 1995 | Recover waste heat from equipment | $3,817 | $1,400 | |
| NV0035 #02 Y:1995 | 02 | 1995 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,143 | $300 | |
| NV0035 #01 Y:1995 | 01 | 1995 | Use most efficient type of electric motors | $2,168 | $7,072 | |
| MS0033 #05 Y:1995 | 05 | 1995 | Direct warmest air to combustion intake | $152,895 | $101,700 | |
| MS0033 #04 Y:1995 | 04 | 1995 | Recover waste heat from equipment | $3,552 | $5,640 | |
| MS0033 #03 Y:1995 | 03 | 1995 | Install timers and/or thermostats | $393 | $730 | |
| MS0033 #02 Y:1995 | 02 | 1995 | Install compressor air intakes in coolest locations | $4,336 | $2,170 | |
| MS0033 #01 Y:1995 | 01 | 1995 | Optimize plant power factor | $16,206 | $7,500 | |
| MO0155 #10 Y:1995 | 10 | 1995 | Reduce scrap production | $1,152 | $520 | |
| MO0155 #09 Y:1995 | 09 | 1995 | Pay utility bills on time | $617 | $20 | |
| MO0155 #08 Y:1995 | 08 | 1995 | Reduce hot water temperature to the minimum required | $96 | $10 | |
| MO0155 #07 Y:1995 | 07 | 1995 | Eliminate leaks in inert gas and compressed air lines/ valves | $6,057 | $500 | |
| MO0155 #06 Y:1995 | 06 | 1995 | Install compressor air intakes in coolest locations | $624 | $590 | |
| MO0155 #05 Y:1995 | 05 | 1995 | Utilize energy-efficient belts and other improved mechanisms | $92 | $40 | |
| MO0155 #04 Y:1995 | 04 | 1995 | Use most efficient type of electric motors | $3,314 | $5,555 | |
| MO0155 #03 Y:1995 | 03 | 1995 | Utilize higher efficiency lamps and/or ballasts | $253 | - | |
| MO0155 #02 Y:1995 | 02 | 1995 | Utilize higher efficiency lamps and/or ballasts | $3,685 | $6,822 | |
| MO0155 #01 Y:1995 | 01 | 1995 | Utilize higher efficiency lamps and/or ballasts | $6,442 | $16,728 | |
| CO0338 #05 Y:1995 | 05 | 1995 | Utilize controls to operate equipment only when needed | $340 | $220 |