ITAC Assessment: OD0039
ITAC logo
ITAC Assessment: OD0039
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Folding and Rigid Paperboard Boxes
NAICS
n/a
SIC 2652: Setup Paperboard Boxes
Sales Range $1
M
to 5
M
# of Employees 60
Plant Area 83,544
ft2
Annual Production 2,652
ton
Production Hrs. Annual 5,610
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $48,565 524,912
kWh
LPG $840 79
MMBtu
Fuel Oil #2 $5,021 874
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,203 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,402

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $6,668 $13,845 $6,668
71,219
kWh
02 2.7135: Install occupancy sensors $3,639 $1,498 $3,639
66,530
kWh
03 2.4322: Use or replace with energy efficient substitutes $2,565 $5,000 $2,565
46,893
kWh
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $305 $225 $305
3,224
kWh
05 2.4133: Use most efficient type of electric motors $236 $1,787 $236
2,638
kWh
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $211 $320 $211
2,345
kWh
07 2.6232: Install set-back timers $579 $189 $579
10,551
kWh
TOTAL RECOMMENDED $14,203 $22,864 $14,203
203,400
kWh
TOTAL IMPLEMENTED $11,402 $16,077 $11,402
153,869
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs