Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

167,740

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
BD0033 #03 Y:1995 Reduce illumination to minimum necessary levels $3,800 $180
BD0033 #02 Y:1995 Utilize higher efficiency lamps and/or ballasts $274 $400
BD0033 #01 Y:1995 Install compressor air intakes in coolest locations $1,652 $500
UF0122 #07 Y:1995 Eliminate leaks in inert gas and compressed air lines/ valves $593 $500
UF0122 #06 Y:1995 Use most efficient type of electric motors $1,796 $5,186
UF0122 #05 Y:1995 Analyze flue gas for proper air/fuel ratio $870 $1,000
UF0122 #04 Y:1995 Use heat from boiler blowdown to preheat boiler feed water $724 $2,600
UF0122 #03 Y:1995 Reduce illumination to minimum necessary levels $2,452 $400
UF0122 #02 Y:1995 Utilize higher efficiency lamps and/or ballasts $1,775 $5,159
UF0122 #01 Y:1995 Utilize higher efficiency lamps and/or ballasts $11,779 $5,399
SF0061 #10 Y:1995 Treat and reuse rinse waters $10,340 $6,344
SF0061 #09 Y:1995 Reduce solution drag-out to prevent solution loss $7,532 $1,288
SF0061 #08 Y:1995 Use precipitating agents in waste water treatment that produce the least quantity of waste $2,880 $25,300
SF0061 #07 Y:1995 Use flow control valves on equipment to optimize water use $6,048 $2,955
SF0061 #06 Y:1995 Cover open tanks $3,373 $1,560
SF0061 #05 Y:1995 Convert combustion equipment to burn natural gas $733 $1,300
SF0061 #04 Y:1995 Install / repair insulation on steam lines $1,658 $2,208
SF0061 #03 Y:1995 Use adjustable frequency drive or multiple speed motors on existing system $347 $1,570
SF0061 #02 Y:1995 Use most efficient type of electric motors $129 $170
SF0061 #01 Y:1995 Install occupancy sensors $1,935 $360