ITAC Assessment: UF0122
ITAC logo
ITAC Assessment: UF0122
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Granular Fertilizer
NAICS
n/a
SIC 2875: Fertilizers, Mixing Only
Sales Range $10
M
to 50
M
# of Employees 25
Plant Area 6,500,000
ft2
Annual Production 180,000,000
lb
Production Hrs. Annual 4,784
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $140,704 1,708,089
kWh
Natural Gas $70,276 18,033
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,989 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,038

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $11,779 $5,399 $11,779
164,127
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,775 $5,159 $1,775
24,912
kWh
-
03 2.7111: Reduce illumination to minimum necessary levels $2,452 $400 $2,452
11,137
kWh
-
04 2.1243: Use heat from boiler blowdown to preheat boiler feed water $724 $2,600 - $724
-
MMBtu
05 2.1233: Analyze flue gas for proper air/fuel ratio $870 $1,000 - $870
-
MMBtu
06 2.4133: Use most efficient type of electric motors $1,796 $5,186 $1,796
23,740
kWh
-
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $593 $500 $593
7,327
kWh
-
TOTAL RECOMMENDED $19,989 $20,244 $18,395
231,243
kWh
$1,594
-
MMBtu
TOTAL IMPLEMENTED $15,038 $12,085 $14,168
195,194
kWh
$870
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs