Assessment Year | 1995 |
---|---|
Principal Product | Plating Services |
NAICS |
n/a
|
SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
Sales Range | $1 M to 5M |
# of Employees | 31 |
Plant Area |
18,000
ft2
|
Annual Production | 9,600
units
|
Production Hrs. Annual | 2,574
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $29,233 | 230,363 |
kWh
|
$0.13 |
Natural Gas | $29,310 | 4,781 |
MMBtu
|
$6.13 |
LPG | $1,995 | 165 |
MMBtu
|
$12.09 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $34,975 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $9,319 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | LPG Savings | Water Disposal Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7135: Install occupancy sensors | $1,935 | $360 |
$1,935
15,240
kWh
|
- | - | - | - | |
02 | 2.4133: Use most efficient type of electric motors | $129 | $170 |
$129
1,172
kWh
|
- | - | - | - | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $347 | $1,570 |
$347
2,638
kWh
|
- | - | - | - | |
04 | 2.2136: Install / repair insulation on steam lines | $1,658 | $2,208 | - |
$1,658
-
MMBtu
|
- | - | - | |
05 | 2.1332: Convert combustion equipment to burn natural gas | $733 | $1,300 | - |
$(-1,262.0)
-
MMBtu
|
$1,995
-
MMBtu
|
- | - | |
06 | 2.2514: Cover open tanks | $3,373 | $1,560 | - |
$3,373
-
MMBtu
|
- | - | - | |
07 | 3.4156: Use flow control valves on equipment to optimize water use | $6,048 | $2,955 | - | - | - |
$6,048
-
Tgal
|
- | |
08 | 3.6114: Use precipitating agents in waste water treatment that produce the least quantity of waste | $2,880 | $25,300 | - | - | - |
$2,880
-
Tgal
|
- | |
09 | 3.1244: Reduce solution drag-out to prevent solution loss | $7,532 | $1,288 | - | - | - | - |
$7,532
-
lb
|
|
10 | 3.4113: Treat and reuse rinse waters | $10,340 | $6,344 | - | - | - |
$10,340
-
Tgal
|
- | |
TOTAL RECOMMENDED | $34,975 | $43,055 |
$2,411
19,050
kWh
|
$3,769
-
MMBtu
|
$1,995
-
MMBtu
|
$19,268
-
Tgal
|
$7,532
-
lb
|
||
TOTAL IMPLEMENTED | $9,319 | $3,666 |
$129
1,172
kWh
|
$1,658
-
MMBtu
|
- | - |
$7,532
-
lb
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | LPG Savings | Water Disposal Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs