Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

168,212

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
AM0249 #08 Y:1995 Minimize water usage $1,300 $900
AM0249 #07 Y:1995 Install skylights $115 $60
AM0249 #06 Y:1995 Install timers and/or thermostats $490 $560
AM0249 #05 Y:1995 Make a practice of turning off lights when not needed $540 -
AM0249 #04 Y:1995 Utilize higher efficiency lamps and/or ballasts $1,130 $390
AM0249 #03 Y:1995 Eliminate leaks in inert gas and compressed air lines/ valves $1,790 $75
AM0249 #02 Y:1995 Reduce the pressure of compressed air to the minimum required $2,310 $45
AM0249 #01 Y:1995 Recharge batteries on during off-peak demand periods $5,760 -
WV0069 #08 Y:1995 Re-use or recycle hot or cold process exhaust air $6,502 $3,500
WV0069 #07 Y:1995 Eliminate leaks in inert gas and compressed air lines/ valves $842 $200
WV0069 #06 Y:1995 Install outside air damper / economizer on hvac unit $1,834 $5,068
WV0069 #05 Y:1995 Use synthetic lubricant $1,217 $1,300
WV0069 #04 Y:1995 Reduce the pressure of compressed air to the minimum required $878 $40
WV0069 #03 Y:1995 Install compressor air intakes in coolest locations $415 $192
WV0069 #02 Y:1995 Utilize energy-efficient belts and other improved mechanisms $329 $1,280
WV0069 #01 Y:1995 Utilize higher efficiency lamps and/or ballasts $3,242 $1,587
TN0552 #07 Y:1995 Reschedule plant operations or reduce load to avoid peaks $11,469 -
TN0552 #06 Y:1995 Make a practice of turning off lights when not needed $318 -
TN0552 #05 Y:1995 Improve air circulation with destratification fans / other methods $607 $1,700
TN0552 #04 Y:1995 Install spectral reflectors / delamp $3,312 -