Assessment Year | 1995 |
---|---|
Principal Product | Lead Crystal Table and Glassware |
NAICS |
n/a
|
SIC | 3229: Pressed and Blown Glass and Glassware, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 240 |
Plant Area |
125,000
ft2
|
Annual Production | 1,000,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $494,040 | 11,235,053 |
kWh
|
$0.044 |
Natural Gas | $115,180 | 26,384 |
MMBtu
|
$4.37 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $15,259 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $6,179 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,242 | $1,587 |
$3,242
89,683
kWh
|
- | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $329 | $1,280 |
$329
14,654
kWh
|
- | |
03 | 2.4221: Install compressor air intakes in coolest locations | $415 | $192 |
$415
18,464
kWh
|
- | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $878 | $40 |
$878
24,326
kWh
|
- | |
05 | 2.4314: Use synthetic lubricant | $1,217 | $1,300 |
$1,217
33,705
kWh
|
- | |
06 | 2.7241: Install outside air damper / economizer on hvac unit | $1,834 | $5,068 |
$1,834
81,770
kWh
|
- | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $842 | $200 |
$842
37,515
kWh
|
- | |
08 | 2.2443: Re-use or recycle hot or cold process exhaust air | $6,502 | $3,500 | - |
$6,502
-
MMBtu
|
|
TOTAL RECOMMENDED | $15,259 | $13,167 |
$8,757
300,117
kWh
|
$6,502
-
MMBtu
|
||
TOTAL IMPLEMENTED | $6,179 | $3,127 |
$6,179
185,229
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs