Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

167,843

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
AS0149 #04 Y:1995 Use most efficient type of electric motors $3,194 $4,093
AS0149 #03 Y:1995 Reduce illumination to minimum necessary levels $393 -
AS0149 #02 Y:1995 Install occupancy sensors $758 $975
AS0149 #01 Y:1995 Utilize higher efficiency lamps and/or ballasts $14,127 $46,367
WI0241 #06 Y:1995 Install occupancy sensors $166 $75
WI0241 #05 Y:1995 Make a practice of turning off lights when not needed $208 $160
WI0241 #04 Y:1995 Eliminate leaks in inert gas and compressed air lines/ valves $473 $210
WI0241 #03 Y:1995 Install vinyl strip / high speed / air curtain doors $1,028 $1,850
WI0241 #02 Y:1995 Improve air circulation with destratification fans / other methods $2,075 $3,720
WI0241 #01 Y:1995 Lower temperature during the winter season and vice-versa $6,790 $880
AM0248 #10 Y:1995 Reduce / eliminate use of disposable product $340 -
AM0248 #09 Y:1995 Recovery metals from rinse water(evap., ion exchange, ro, electrolysis, electrodialysis) and reuse rinse water $8,550 $19,700
AM0248 #08 Y:1995 Install equipment (eg compactor) to reduce disposal costs $38,980 $40,000
AM0248 #07 Y:1995 Analyze flue gas for proper air/fuel ratio $310 $500
AM0248 #06 Y:1995 Make a practice of turning off lights when not needed $350 -
AM0248 #05 Y:1995 Upgrade obsolete equipment $790 $655
AM0248 #04 Y:1995 Eliminate leaks in inert gas and compressed air lines/ valves $750 $200
AM0248 #03 Y:1995 Insulate bare equipment $1,020 $290
AM0248 #02 Y:1995 Optimize plant power factor $8,584 $8,750
AM0248 #01 Y:1995 Insulate bare equipment $9,500 $2,930