| Assessment Year | 1995 |
|---|---|
| Principal Product | Precision Machined Parts |
| NAICS |
n/a
|
| SIC | 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified |
| Sales Range | $5 M to 10M |
| # of Employees | 70 |
| Plant Area |
40,000
ft2
|
| Annual Production | 750
pieces
|
| Production Hrs. Annual | 4,680
hrs
|
| Location (State) | Arizona |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $157,786 | 1,867,819 |
kWh
|
$0.084 |
| Natural Gas | $5,955 | 888 |
MMBtu
|
$6.71 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $38,449 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $15,763 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $14,127 | $46,367 |
$14,127
202,814
kWh
|
|
| 02 | 2.7135: Install occupancy sensors | $758 | $975 |
$758
14,068
kWh
|
|
| 03 | 2.7111: Reduce illumination to minimum necessary levels | $393 | - |
$393
5,275
kWh
|
|
| 04 | 2.4133: Use most efficient type of electric motors | $3,194 | $4,093 |
$3,194
43,376
kWh
|
|
| 05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $734 | - |
$734
9,086
kWh
|
|
| 06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $239 | $1,072 |
$239
2,931
kWh
|
|
| 07 | 2.2511: Insulate bare equipment | $234 | $490 |
$234
4,396
kWh
|
|
| 08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $485 | $220 |
$485
7,327
kWh
|
|
| 09 | 2.7232: Replace existing hvac unit with high efficiency model | $18,285 | $54,010 |
$18,285
264,361
kWh
|
|
| TOTAL RECOMMENDED | $38,449 | $107,227 |
$38,449
553,634
kWh
|
||
| TOTAL IMPLEMENTED | $15,763 | $47,562 |
$15,763
229,484
kWh
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs