Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

167,864

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
ME0168 #06 Y:1995 Purchase gas directly from a contract gas supplier $3,000 $500
ME0168 #05 Y:1995 Replace electrically-operated equipment with fossil fuel equipment $4,610 $5,000
ME0168 #04 Y:1995 Eliminate leaks in inert gas and compressed air lines/ valves $4,019 $600
ME0168 #03 Y:1995 Eliminate or reduce compressed air usage $5,640 $1,417
ME0168 #02 Y:1995 Eliminate or reduce compressed air usage $12,532 $1,125
ME0168 #01 Y:1995 Utilize higher efficiency lamps and/or ballasts $34,808 $109,189
KG0036 #06 Y:1995 Use synthetic lubricant $190 -
KG0036 #05 Y:1995 Utilize higher efficiency lamps and/or ballasts $394 $459
KG0036 #04 Y:1995 Use most efficient type of electric motors $790 $2,370
KG0036 #03 Y:1995 Install timers and/or thermostats $3,896 $1,800
KG0036 #02 Y:1995 Eliminate leaks in inert gas and compressed air lines/ valves $4,127 $500
KG0036 #01 Y:1995 Use power during off-peak periods $12,130 -
AS0154 #10 Y:1995 Install occupancy sensors $741 $1,350
AS0154 #09 Y:1995 Utilize higher efficiency lamps and/or ballasts $1,111 $3,204
AS0154 #08 Y:1995 Reduce illumination to minimum necessary levels $2,009 $700
AS0154 #07 Y:1995 Use separate switches on perimeter lighting which may be turned off when natural light is available $358 $100
AS0154 #06 Y:1995 Utilize higher efficiency lamps and/or ballasts $3,282 $9,274
AS0154 #05 Y:1995 Install compressor air intakes in coolest locations $238 $200
AS0154 #04 Y:1995 Eliminate leaks in inert gas and compressed air lines/ valves $554 $240
AS0154 #03 Y:1995 Use adjustable frequency drive or multiple speed motors on existing system $2,380 $2,600