ITAC Assessment: AS0154
ITAC logo
ITAC Assessment: AS0154
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Kitchen and Bath Cabinets
NAICS
n/a
SIC 2434: Wood Kitchen Cabinets
Sales Range $50
M
to 100
M
# of Employees 280
Plant Area 181,500
ft2
Annual Production 488,379
pieces
Production Hrs. Annual 2,210
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $127,251 1,361,079
kWh
Natural Gas $7,416 1,584
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,260 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,233

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4133: Use most efficient type of electric motors $1,199 $2,108 $1,199
9,672
kWh
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $388 - $388
3,517
kWh
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,380 $2,600 $2,380
21,395
kWh
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $554 $240 $554
5,275
kWh
05 2.4221: Install compressor air intakes in coolest locations $238 $200 $238
2,345
kWh
06 2.7142: Utilize higher efficiency lamps and/or ballasts $3,282 $9,274 $3,282
37,222
kWh
07 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $358 $100 $358
6,448
kWh
08 2.7111: Reduce illumination to minimum necessary levels $2,009 $700 $2,009
23,447
kWh
09 2.7142: Utilize higher efficiency lamps and/or ballasts $1,111 $3,204 $1,111
12,896
kWh
10 2.7135: Install occupancy sensors $741 $1,350 $741
13,482
kWh
TOTAL RECOMMENDED $12,260 $19,776 $12,260
135,699
kWh
TOTAL IMPLEMENTED $6,233 $10,214 $6,233
69,461
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs