Assessment Year | 2016 |
---|---|
Principal Product | Aluminum thresholds, weatherstripping |
NAICS | 332510: Hardware Manufacturing |
SIC | 3429: Hardware, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 255 |
Plant Area |
250,000
ft2
|
Annual Production | 900,000
lb
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $377,430 | 7,787,920 |
kWh
|
$0.048 | |
Electricity Demand | $109,041 | 18,798 |
kW-mo/yr
|
$5.80 | |
Natural Gas | $163,850 | 50,998 |
MMBtu
|
$3.21 | |
Waste Disposal Costs | |||||
Water Usage | $217,106 | 19,811 |
Tgal
|
$10.96 | |
TOTAL YEARLY COSTS | $867,427 | ||||
RECOMMENDED SAVINGS* | $111,278 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $36,429 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7241: Install outside air damper / economizer on hvac unit | $6,142 | $29,000 |
$6,142
127,955
kWh
|
- | - | - | |
02 | 2.7211: Clean and maintain refrigerant condensers and towers | $1,510 | $2,320 |
$1,051
21,896
kWh
|
$459
-
kW-mo/yr
|
- | - | |
03 | 2.7134: Use photocell controls | $862 | $3,870 |
$862
17,968
kWh
|
- | - | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $7,857 | $18,014 |
$7,857
163,682
kWh
|
- | - | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $2,007 | $926 |
$2,007
41,817
kWh
|
- | - | - | |
06 | 2.2314: Replace heat treating oven with more efficient unit | $27,228 | $83,600 |
$27,228
465,754
kWh
|
- | - | - | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $45,797 | $118,583 |
$45,797
954,114
kWh
|
- | - | - | |
08 | 2.2515: Use optimum thickness insulation | $382 | $1,310 | - | - | - |
$382
-
MMBtu
|
|
09 | 2.2515: Use optimum thickness insulation | $58 | $203 | - | - | - |
$58
-
MMBtu
|
|
10 | 2.3137: Use power during off-peak periods | $12,184 | - | - | - | $12,184 | - | |
11 | 2.3212: Optimize plant power factor | $7,251 | $25,830 | - | - | $7,251 | - | |
TOTAL RECOMMENDED | $111,278 | $283,656 |
$90,944
1,793,186
kWh
|
$459
-
kW-mo/yr
|
$19,435 |
$440
-
MMBtu
|
||
TOTAL IMPLEMENTED | $36,429 | $113,263 |
$28,279
487,650
kWh
|
$459
-
kW-mo/yr
|
$7,251 |
$440
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs