ITAC Assessment: OK0948
ITAC logo
ITAC Assessment: OK0948
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Aluminum thresholds, weatherstripping
NAICS 332510: Hardware Manufacturing
SIC 3429: Hardware, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 255
Plant Area 250,000
ft2
Annual Production 900,000
lb
Production Hrs. Annual 7,488
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $377,430 7,787,920
kWh
Electricity Demand $109,041 18,798
kW-mo/yr
Natural Gas $163,850 50,998
MMBtu
Waste Disposal Costs
Water Usage $217,106 19,811
Tgal
TOTAL YEARLY COSTS $867,427
RECOMMENDED SAVINGS* $111,278 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $36,429

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.7241: Install outside air damper / economizer on hvac unit $6,142 $29,000 $6,142
127,955
kWh
- - -
02 2.7211: Clean and maintain refrigerant condensers and towers $1,510 $2,320 $1,051
21,896
kWh
$459
-
kW-mo/yr
- -
03 2.7134: Use photocell controls $862 $3,870 $862
17,968
kWh
- - -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,857 $18,014 $7,857
163,682
kWh
- - -
05 2.4221: Install compressor air intakes in coolest locations $2,007 $926 $2,007
41,817
kWh
- - -
06 2.2314: Replace heat treating oven with more efficient unit $27,228 $83,600 $27,228
465,754
kWh
- - -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $45,797 $118,583 $45,797
954,114
kWh
- - -
08 2.2515: Use optimum thickness insulation $382 $1,310 - - - $382
-
MMBtu
09 2.2515: Use optimum thickness insulation $58 $203 - - - $58
-
MMBtu
10 2.3137: Use power during off-peak periods $12,184 - - - $12,184 -
11 2.3212: Optimize plant power factor $7,251 $25,830 - - $7,251 -
TOTAL RECOMMENDED $111,278 $283,656 $90,944
1,793,186
kWh
$459
-
kW-mo/yr
$19,435 $440
-
MMBtu
TOTAL IMPLEMENTED $36,429 $113,263 $28,279
487,650
kWh
$459
-
kW-mo/yr
$7,251 $440
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs