ITAC Assessment: KG0036
ITAC logo
ITAC Assessment: KG0036
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Security Hardware,Including locks;Aluminum & Steel Security
NAICS
n/a
SIC 3442: Metal Doors, Sash, Frames, Molding, and Trim Manufacturing
Sales Range $10
M
to 50
M
# of Employees 190
Plant Area 120,000
ft2
Annual Production 7,650,000
lb
Production Hrs. Annual 2,550
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $109,317 1,915,006
kWh
Natural Gas $53,986 15,706
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,527 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,631

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.3137: Use power during off-peak periods $12,130 - $12,130
-
kWh
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,127 $500 $4,127
117,819
kWh
03 2.7261: Install timers and/or thermostats $3,896 $1,800 $3,896
118,113
kWh
04 2.4133: Use most efficient type of electric motors $790 $2,370 $790
22,567
kWh
05 2.7142: Utilize higher efficiency lamps and/or ballasts $394 $459 $394
11,137
kWh
06 2.4314: Use synthetic lubricant $190 - $190
5,569
kWh
TOTAL RECOMMENDED $21,527 $5,129 $21,527
275,205
kWh
TOTAL IMPLEMENTED $17,631 $3,329 $17,631
157,092
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs