Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,855

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OR0492 #04 Y:2005 Convert from indirect to direct fired systems $34,000 $190,000
OR0492 #03 Y:2005 Meter waste water $52,000 $6,300
OR0492 #02 Y:2005 Recover heat from exhausted steam, hot air or hot water $56,000 $167,300
OR0492 #01 Y:2005 Treat and reuse rinse waters $96,200 $30,000
OR0491 #08 Y:2005 Optimize plant power factor $650 $1,800
OR0491 #07 Y:2005 Use / purchase optimum sized compressor $7,040 $10,650
OR0491 #06 Y:2005 Install occupancy sensors $2,440 $1,900
OR0491 #05 Y:2005 Install / repair insulation on condensate lines $730 $1,300
OR0491 #04 Y:2005 Establish burner maintenance schedule for boilers $1,180 $1,000
OR0491 #03 Y:2005 Change rate schedules or other changes in utility service $14,000 $7,200
OR0491 #02 Y:2005 Modify material application methods $17,000 $7,200
OR0491 #01 Y:2005 Regrind, reuse, or sell scrap plastic parts $22,340 -
OR0490 #08 Y:2005 Optimize plant power factor $2,750 $5,600
OR0490 #07 Y:2005 Turn off equipment during breaks, reduce operating time $1,720 -
OR0490 #06 Y:2005 Reduce illumination to minimum necessary levels $8,100 $1,800
OR0490 #05 Y:2005 Eliminate or reduce compressed air usage $7,600 -
OR0490 #04 Y:2005 Add equipment/ operators to reduce production bottleneck $10,400 $1,000
OR0490 #03 Y:2005 Regrind, reuse, or sell scrap plastic parts $24,000 -
OR0490 #02 Y:2005 Use less wasteful packaging $23,500 $1,000
OR0490 #01 Y:2005 Use less wasteful packaging $35,000 $1,000