ITAC Assessment: OR0492
ITAC logo
ITAC Assessment: OR0492
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Laundered Linen
NAICS 812331: Linen Supply
SIC 7213: Linen Supply
Sales Range $10
M
to 50
M
# of Employees 175
Plant Area 60,000
ft2
Annual Production 21,000,000
lb
Production Hrs. Annual 5,668
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $173,375 2,984,080
kWh
Electricity Demand $6,246 6,064
kW-mo/yr
Natural Gas $434,078 67,074
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $268,682 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $126,682

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Water Consumption Savings
01 3.4113: Treat and reuse rinse waters $96,200 $30,000 - - - - $69,900
-
Tgal
$26,300
-
Tgal
02 2.2449: Recover heat from exhausted steam, hot air or hot water $56,000 $167,300 - - - $56,000
-
MMBtu
- -
03 3.4155: Meter waste water $52,000 $6,300 - - - - $52,000
-
Tgal
-
04 2.5111: Convert from indirect to direct fired systems $34,000 $190,000 - - - $34,000
-
MMBtu
- -
05 2.1233: Analyze flue gas for proper air/fuel ratio $11,600 $1,800 - - - $11,600
-
MMBtu
- -
06 2.4133: Use most efficient type of electric motors $7,130 - $6,880
118,400
kWh
$250
-
kW-mo/yr
- - - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,568 $6,500 $6,391
110,000
kWh
$177
-
kW-mo/yr
- - - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $2,984 $7,300 $2,900
50,756
kWh
$84
-
kW-mo/yr
- - - -
09 2.3212: Optimize plant power factor $2,200 $10,000 - - $2,200 - - -
TOTAL RECOMMENDED $268,682 $419,200 $16,171
279,156
kWh
$511
-
kW-mo/yr
$2,200 $101,600
-
MMBtu
$121,900
-
Tgal
$26,300
-
Tgal
TOTAL IMPLEMENTED $126,682 $55,600 $16,171
279,156
kWh
$511
-
kW-mo/yr
$2,200 $11,600
-
MMBtu
$69,900
-
Tgal
$26,300
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs