ITAC Assessment: AS0113
ITAC logo
ITAC Assessment: AS0113
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Aerospace & Defense Components
NAICS
n/a
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 46
Plant Area 25,000
ft2
Annual Production 25,000
pieces
Production Hrs. Annual 2,600
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $94,485 893,904
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,876 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,523

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,597 $4,361 $3,597
33,998
kWh
-
02 2.7134: Use photocell controls $297 $30 $297
2,931
kWh
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $381 - $381
3,517
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $447 $250 $447
4,103
kWh
-
05 2.4314: Use synthetic lubricant $547 $2,110 $547
3,224
kWh
-
06 2.4133: Use most efficient type of electric motors $2,076 $3,108 $2,076
19,637
kWh
-
07 2.8114: Change rate schedules or other changes in utility service $11,531 $20,250 - $11,531
TOTAL RECOMMENDED $18,876 $30,109 $7,345
67,410
kWh
$11,531
TOTAL IMPLEMENTED $2,523 $3,358 $2,523
23,740
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs