ITAC Assessment: BD0359
ITAC logo
ITAC Assessment: BD0359
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Oil and water based wppd finishing products
NAICS 325510: Paint and Coating Manufacturing
SIC 2851: Paints, Varnishes, Lacquers, Enamels, and Allied Products
Sales Range $100
M
to 500
M
# of Employees 186
Plant Area 302,000
ft2
Annual Production 12,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $230,257 4,747,500
kWh
Electricity Demand $104,132 9,917
kW-mo/yr
Electricity Fees $882 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $156,593 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $49,477

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Primary Raw Material Savings
01 2.7135: Install occupancy sensors $7,879 $1,450 $4,225
87,121
kWh
$3,654
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,596 $1,225 $743
15,312
kWh
$220
-
kW-mo/yr
- $633
03 2.7111: Reduce illumination to minimum necessary levels $17,260 $660 $12,521
136,580
kWh
$4,739
-
kW-mo/yr
- -
04 2.4221: Install compressor air intakes in coolest locations $2,366 $800 $1,568
32,329
kWh
$798
-
kW-mo/yr
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $12,430 - $8,039
165,750
kWh
$4,391
-
kW-mo/yr
- -
06 2.2437: Recover waste heat from equipment $26,170 $2,000 - - $26,170
-
MMBtu
-
07 2.1221: Replace obsolete burners with more efficient ones $2,175 $3,000 - - $2,175
-
MMBtu
-
08 2.7231: Use radiant heater for spot heating $48,695 $18,550 - - $48,695
-
MMBtu
-
09 4.454: Modify startup/shutdown times $30,076 - $15,334
316,160
kWh
$14,742
-
kW-mo/yr
- -
10 2.4133: Use most efficient type of electric motors $7,946 $8,340 $5,771
118,483
kWh
$2,175
-
kW-mo/yr
- -
TOTAL RECOMMENDED $156,593 $36,025 $48,201
871,735
kWh
$30,719
-
kW-mo/yr
$77,040
-
MMBtu
$633
TOTAL IMPLEMENTED $49,477 $12,475 $32,867
555,575
kWh
$15,977
-
kW-mo/yr
- $633
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs