ITAC Assessment: KU0267
ITAC logo
ITAC Assessment: KU0267
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product MACHINE METAL COMPONENTS
NAICS
n/a
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 290
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 6,600
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $217,006 3,586,753
kWh
Natural Gas $33,519 14,915
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,575 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,302

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $807 $207 $807
13,189
kWh
- -
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $968 $475 $1,148
18,757
kWh
$(-180.0)
-
MMBtu
-
03 2.4322: Use or replace with energy efficient substitutes $5,215 $10,000 $699
11,430
kWh
$1,078
-
MMBtu
$3,438
04 2.4231: Reduce the pressure of compressed air to the minimum required $2,811 $30 $2,811
46,014
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,716 $5,201 $2,716
44,549
kWh
- -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,058 $2,400 $1,058
17,292
kWh
- -
TOTAL RECOMMENDED $13,575 $18,313 $9,239
151,231
kWh
$898
-
MMBtu
$3,438
TOTAL IMPLEMENTED $7,302 $5,913 $7,482
122,509
kWh
$(-180.0)
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs