ITAC Assessment: OR0491
ITAC logo
ITAC Assessment: OR0491
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Fruit Filling and Sweeteners
NAICS 311421: Fruit and Vegetable Canning
SIC 2033: Canned Fruits, Vegetables, Preserves, Jams, and Jellies
Sales Range $10
M
to 50
M
# of Employees 33
Plant Area 50,300
ft2
Annual Production 26,000,000
lb
Production Hrs. Annual 2,500
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $52,850 909,640
kWh
Electricity Demand $3,029 2,941
kW-mo/yr
Electricity Fees $718 -
Natural Gas $69,735 75,134
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $65,380 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Other Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings
01 3.5212: Regrind, reuse, or sell scrap plastic parts $22,340 - - - - - - $22,340
-
lb
- -
02 3.7211: Modify material application methods $17,000 $7,200 - - - - - - - $17,000
03 2.8114: Change rate schedules or other changes in utility service $14,000 $7,200 - - - $14,000
-
MMBtu
- - - -
04 2.1231: Establish burner maintenance schedule for boilers $1,180 $1,000 - - - $1,180
-
MMBtu
- - - -
05 2.2122: Install / repair insulation on condensate lines $730 $1,300 - - - - $730
-
MMBtu
- - -
06 2.7135: Install occupancy sensors $2,440 $1,900 $1,660
28,000
kWh
- - - - - $230 $550
07 2.4226: Use / purchase optimum sized compressor $7,040 $10,650 $6,880
119,000
kWh
$160
-
kW-mo/yr
- - - - - -
08 2.3212: Optimize plant power factor $650 $1,800 - - $650 - - - - -
TOTAL RECOMMENDED $65,380 $31,050 $8,540
147,000
kWh
$160
-
kW-mo/yr
$650 $15,180
-
MMBtu
$730
-
MMBtu
$22,340
-
lb
$230 $17,550
TOTAL IMPLEMENTED - - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Other Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs