ITAC Assessment: UD0845
ITAC logo
ITAC Assessment: UD0845
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Sheet Metal Ducts
NAICS 332322: Sheet Metal Work Manufacturing
SIC 3444: Sheet Metal Work
Sales Range $10
M
to 50
M
# of Employees 61
Plant Area 92,700
ft2
Annual Production 5,842,482
lb
Production Hrs. Annual 2,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $48,338 777,136
kWh
Electricity Demand $14,396 2,198
kW-mo/yr
Natural Gas $22,873 2,554
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,882 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,819

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.6218: Turn off equipment when not in use $1,244 $500 $1,244
20,000
kWh
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $534 - $327
5,265
kWh
$207
-
kW-mo/yr
-
03 2.4222: Install adequate dryers on air lines to eliminate blowdown $4,285 $4,000 $2,626
42,226
kWh
$1,659
-
kW-mo/yr
-
04 2.4221: Install compressor air intakes in coolest locations $286 $1,500 $175
2,821
kWh
$111
-
kW-mo/yr
-
05 2.7423: Reduce heat gain by window tinting $533 - - - $533
-
MMBtu
TOTAL RECOMMENDED $6,882 $6,000 $4,372
70,312
kWh
$1,977
-
kW-mo/yr
$533
-
MMBtu
TOTAL IMPLEMENTED $4,819 $4,000 $2,953
47,491
kWh
$1,866
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs