ITAC Assessment: ST0036
ITAC logo
ITAC Assessment: ST0036
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product TEFLON PRODUCTS
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area
n/a
Annual Production 2,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $232,061 3,037,515
kWh
Natural Gas $35,391 5,803
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $122,319 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,560

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $10,879 $20,400 $10,879
142,438
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,064 $56 $4,064
53,341
kWh
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $5,767 - $5,767
75,615
kWh
-
04 2.2511: Insulate bare equipment $197 $340 $197
2,638
kWh
-
05 2.2511: Insulate bare equipment $420 $200 $515
6,741
kWh
$(-95.0)
-
MMBtu
06 2.1311: Replace electrically-operated equipment with fossil fuel equipment $99,880 $200,000 $133,494
1,400,352
kWh
$(-33,614.0)
-
MMBtu
07 2.2511: Insulate bare equipment $320 $160 $392
5,275
kWh
$(-72.0)
-
MMBtu
08 2.7243: Improve air circulation with destratification fans / other methods $792 $1,680 $(-342.0)
(-4,396)
kWh
$1,134
-
MMBtu
TOTAL RECOMMENDED $122,319 $222,836 $154,966
1,682,004
kWh
$(-32,647.0)
-
MMBtu
TOTAL IMPLEMENTED $11,560 $2,436 $10,593
139,214
kWh
$967
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs