Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,122

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UD0850 #10 Y:2011 Install outside air damper / economizer on hvac unit $2,348 $9,000
UD0850 #09 Y:2011 Reduce ventilation air $2,781 $200
UD0850 #08 Y:2011 Install outside air damper / economizer on hvac unit $3,375 $20,000
UD0850 #07 Y:2011 Eliminate leaks in inert gas and compressed air lines/ valves $452 $1,000
UD0850 #06 Y:2011 Eliminate or reduce compressed air usage $648 -
UD0850 #05 Y:2011 Recover waste heat from equipment $827 $1,000
UD0850 #04 Y:2011 Upgrade controls on compressors $15,877 $33,000
UD0850 #03 Y:2011 Keep lamps and reflectors clean $362 $374
UD0850 #02 Y:2011 Install occupancy sensors $2,432 $750
UD0850 #01 Y:2011 Use solar heat to make electricty $2,058 $42,695
SU0317 #06 Y:2011 Conserve energy by efficient use of vending machines $228 $536
SU0317 #05 Y:2011 Use / purchase optimum sized compressor $12,834 $27,300
SU0317 #04 Y:2011 Install compressor air intakes in coolest locations $1,153 $2,179
SU0317 #03 Y:2011 Reduce ventilation air $9,899 $14,092
SU0317 #02 Y:2011 Preheat combustion air with waste heat $1,105 $270
SU0317 #01 Y:2011 Condense operation into one building $333,000 $6,675
SF0408 #06 Y:2011 Use solar heat to make electricty $231,136 $1,514,353
SF0408 #05 Y:2011 Install occupancy sensors $3,255 $11,297
SF0408 #04 Y:2011 Utilize a less expensive cooling method $3,344 $4,267
SF0408 #03 Y:2011 Reduce the pressure of compressed air to the minimum required $1,571 $80