Assessment Year | 2012 |
---|---|
Principal Product | Circuit Boards |
NAICS | 334418: Printed Circuit Assembly (Electronic Assembly) Manufacturing |
SIC | 3679: Electronic Components, Not Elsewhere Classified |
Sales Range | $100 M to 500M |
# of Employees | 494 |
Plant Area |
255,000
ft2
|
Annual Production | 99,200
pieces
|
Production Hrs. Annual | 4,350
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $274,504 | 4,392,785 |
kWh
|
$0.062 |
Electricity Demand | $2,980 | 1,047 |
kW-mo/yr
|
$2.85 |
Natural Gas | $36,898 | 667 |
MMBtu
|
$55.32 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $358,219 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $356,886 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 4.512: Condense operation into one building | $333,000 | $6,675 | - | - | - | $333,000 | |
02 | 2.2442: Preheat combustion air with waste heat | $1,105 | $270 | - | - |
$1,105
-
MMBtu
|
- | |
03 | 2.7314: Reduce ventilation air | $9,899 | $14,092 |
$749
11,897
kWh
|
$120
-
kW-mo/yr
|
$9,030
-
MMBtu
|
- | |
04 | 2.4221: Install compressor air intakes in coolest locations | $1,153 | $2,179 |
$1,153
18,308
kWh
|
- | - | - | |
05 | 2.4226: Use / purchase optimum sized compressor | $12,834 | $27,300 |
$12,834
203,710
kWh
|
- | - | - | |
06 | 2.6211: Conserve energy by efficient use of vending machines | $228 | $536 |
$228
3,618
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $358,219 | $51,052 |
$14,964
237,533
kWh
|
$120
-
kW-mo/yr
|
$10,135
-
MMBtu
|
$333,000 | ||
TOTAL IMPLEMENTED | $356,886 | $50,246 |
$14,736
233,915
kWh
|
$120
-
kW-mo/yr
|
$9,030
-
MMBtu
|
$333,000 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs