ITAC Assessment: SU0317
ITAC logo
ITAC Assessment: SU0317
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Circuit Boards
NAICS 334418: Printed Circuit Assembly (Electronic Assembly) Manufacturing
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 494
Plant Area 255,000
ft2
Annual Production 99,200
pieces
Production Hrs. Annual 4,350
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $274,504 4,392,785
kWh
Electricity Demand $2,980 1,047
kW-mo/yr
Natural Gas $36,898 667
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $358,219 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $356,886

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 4.512: Condense operation into one building $333,000 $6,675 - - - $333,000
02 2.2442: Preheat combustion air with waste heat $1,105 $270 - - $1,105
-
MMBtu
-
03 2.7314: Reduce ventilation air $9,899 $14,092 $749
11,897
kWh
$120
-
kW-mo/yr
$9,030
-
MMBtu
-
04 2.4221: Install compressor air intakes in coolest locations $1,153 $2,179 $1,153
18,308
kWh
- - -
05 2.4226: Use / purchase optimum sized compressor $12,834 $27,300 $12,834
203,710
kWh
- - -
06 2.6211: Conserve energy by efficient use of vending machines $228 $536 $228
3,618
kWh
- - -
TOTAL RECOMMENDED $358,219 $51,052 $14,964
237,533
kWh
$120
-
kW-mo/yr
$10,135
-
MMBtu
$333,000
TOTAL IMPLEMENTED $356,886 $50,246 $14,736
233,915
kWh
$120
-
kW-mo/yr
$9,030
-
MMBtu
$333,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs