Assessment Year | 1996 |
---|---|
Principal Product | Men's Pants |
NAICS |
n/a
|
SIC | 2325: Men's and Boys' Separate Trousers and Slacks |
Sales Range | $50 M to 100M |
# of Employees | 800 |
Plant Area |
88,000
ft2
|
Annual Production | 0
pieces
|
Production Hrs. Annual | 4,030
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $200,035 | 3,968,933 |
kWh
|
$0.050 |
Electricity Demand | $31,337 | 17,730 |
kW-mo/yr
|
$1.77 |
Electricity Fees | $1,493 | - |
|
- |
Natural Gas | $45,239 | 17,732 |
MMBtu
|
$2.55 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $116,494 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $23,966 | $42,000 |
$23,966
114,596
kWh
|
- | - | |
02 | 2.4133: Use most efficient type of electric motors | $4,752 | $26,520 |
$4,224
86,166
kWh
|
$528
-
kW-mo/yr
|
- | |
03 | 2.4314: Use synthetic lubricant | $1,309 | - |
$1,163
23,740
kWh
|
$146
-
kW-mo/yr
|
- | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,254 | $1,530 |
$1,254
25,498
kWh
|
- | - | |
05 | 2.7229: Air condition only space necessary | $2,569 | $1,150 |
$2,569
51,290
kWh
|
- | - | |
06 | 2.7135: Install occupancy sensors | $751 | $130 |
$751
2,345
kWh
|
- | - | |
07 | 2.4221: Install compressor air intakes in coolest locations | $490 | $300 |
$414
4,396
kWh
|
$76
-
kW-mo/yr
|
- | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $485 | $353 |
$409
8,499
kWh
|
$76
-
kW-mo/yr
|
- | |
09 | 3.1192: Reduce scrap production | $76,927 | - | - | - |
$76,927
-
lb
|
|
10 | 3.5311: Recover and reuse waste material | $3,991 | $2,344 | - | - |
$3,991
-
lb
|
|
TOTAL RECOMMENDED | $116,494 | $74,327 |
$34,750
316,530
kWh
|
$826
-
kW-mo/yr
|
$80,918
-
lb
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs