ITAC Assessment: KG0066
ITAC logo
ITAC Assessment: KG0066
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Men's Pants
NAICS
n/a
SIC 2325: Men's and Boys' Separate Trousers and Slacks
Sales Range $50
M
to 100
M
# of Employees 800
Plant Area 88,000
ft2
Annual Production 0
pieces
Production Hrs. Annual 4,030
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $200,035 3,968,933
kWh
Electricity Demand $31,337 17,730
kW-mo/yr
Electricity Fees $1,493 -
Natural Gas $45,239 17,732
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $116,494 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $23,966 $42,000 $23,966
114,596
kWh
- -
02 2.4133: Use most efficient type of electric motors $4,752 $26,520 $4,224
86,166
kWh
$528
-
kW-mo/yr
-
03 2.4314: Use synthetic lubricant $1,309 - $1,163
23,740
kWh
$146
-
kW-mo/yr
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,254 $1,530 $1,254
25,498
kWh
- -
05 2.7229: Air condition only space necessary $2,569 $1,150 $2,569
51,290
kWh
- -
06 2.7135: Install occupancy sensors $751 $130 $751
2,345
kWh
- -
07 2.4221: Install compressor air intakes in coolest locations $490 $300 $414
4,396
kWh
$76
-
kW-mo/yr
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $485 $353 $409
8,499
kWh
$76
-
kW-mo/yr
-
09 3.1192: Reduce scrap production $76,927 - - - $76,927
-
lb
10 3.5311: Recover and reuse waste material $3,991 $2,344 - - $3,991
-
lb
TOTAL RECOMMENDED $116,494 $74,327 $34,750
316,530
kWh
$826
-
kW-mo/yr
$80,918
-
lb
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs